Schedule performance index
Definition
In PMI usage, the schedule performance index (SPI) is an earned value indicator. It is calculated by dividing earned value by planned value. A value of 1 means that exactly as much work has been completed as planned; below 1 the project is behind schedule, above 1 it is ahead. An SPI of 0.9 means, put simply, that only nine tenths of the planned work has been performed so far. The indicator is well suited for comparisons between projects and across several reporting periods.
Equivalents in other frameworks
Concept Schedule efficiency of work performed · three frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| ISO 21506 | Schedule performance index | equivalent | — |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Schedule performance index
- Topic area
- Monitoring and control
Distinction
The term is equivalent to the ISO 21506 term schedule performance index. Schedule variance expresses the same relationship as a difference in monetary units, the SPI as a ratio. The cost performance index measures cost efficiency in the same way. Unlike an analysis of the critical path, the SPI says nothing about whether the late work threatens the finish date.
In practice
At the end of the quarter, a project introducing HR software reports a planned value of 250,000 euros and an earned value of 200,000 euros; the SPI is 0.8. The project manager then checks the schedule and finds that the delay lies in data migration, which is on the critical path. She reports the finish date as at risk and proposes an additional migration run over a weekend.
Frequently asked questions
Why does the SPI always approach 1 towards the end of the project?
Because at the end all work has been completed, and earned value and planned value both equal the budget, regardless of how late the project finishes. In the final third, the classic SPI therefore loses meaning.
Is an SPI above 1 sufficient proof of schedule adherence?
Not on its own. A project can bring forward non-critical work and show a high SPI while activities on the critical path fall behind. The SPI should therefore be checked against the schedule.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Schedule performance index. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/schedule-performance-index-pmi/
Schedule performance index (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/schedule-performance-index-pmi/ (retrieved 24 November 2026)
@misc{scheduleperformanceindexpmi,
title = {Schedule performance index},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/schedule-performance-index-pmi/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/schedule-performance-index-pmi/"> <p>Earned value divided by planned value; shows how efficiently the project is progressing compared with its schedule.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/schedule-performance-index-pmi/">Schedule performance index</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.