Variance

Definition

In PMI usage, a variance is a measurable difference between actual results and a known baseline or an expected value. In a project it mainly concerns scope, schedule and cost, but it can also affect quality, resources or other planned quantities. Variances are identified while monitoring project work and compared with predefined thresholds. Only when a variance exceeds a threshold is it usually investigated and, where necessary, answered with a corrective action. Well-known forms are schedule variance and cost variance.

Equivalents in other frameworks

Concept Difference between plan and actual · one framework reviewed

Equivalents of Variance in other frameworks
FrameworkTerm thereRelationNote
ISO 21506Varianceequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Variance

Distinction

The term is equivalent to the ISO 21506 term variance. Despite the identical English spelling, it has nothing to do with statistical variance, a measure of dispersion. Variance analysis is the technique used to investigate the cause and extent of a variance. An issue can be the cause or consequence of a variance but is not the same thing.

In practice

For an exhibition stand production, 120 labour hours are planned for assembly, but 150 are actually needed. The variance is 30 hours or 25 percent. According to the project management plan, variances above 10 percent are investigated. The team finds that a delivery was incomplete and agrees with the supplier that goods will be checked before dispatch.

Frequently asked questions

Is every variance a problem?

No. Small variances are normal and are absorbed by tolerances. Positive variances, such as lower costs, should also be understood, because they can point to inaccurate planning or missing work.

What is a variance measured against?

Against an approved baseline or an agreed target value. Without a stable reference, variances cannot be determined meaningfully.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Variance. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/variance-pmi/

Short form

Variance (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/variance-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{variancepmi,
  title   = {Variance},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/variance-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/variance-pmi/">
  <p>Quantifiable difference between what the baseline or expectation says should apply and the value actually observed.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/variance-pmi/">Variance</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.