Acceptance record

also: Acceptance certificate

Definition

The acceptance record documents what was inspected at an acceptance and with what result. It states the date and participants, the deliverable accepted, the criteria applied, defects found with deadlines for remedying them, any reservations and the declaration of whether acceptance is given. It is signed by the client and the contractor.

Equivalents in other frameworks

No equivalents have been recorded for this term yet.

Classification

this term
Acceptance record
Topic area
Closing

Distinction

Acceptance is the declaration; the record is the evidence of it. A test report documents test results without a declaration of acceptance. Meeting minutes record the results of a meeting and usually have no legal effect on the contract.

In practice

After a ventilation system has been installed in a school, the site management and the installer jointly draw up the acceptance record. It lists the measured air change rates in all classrooms, two missing access panels and an outstanding briefing for the caretaker, each with a deadline. Acceptance is declared subject to these points. When the access panels have still not been fitted after six weeks, the record serves as the basis for the formal reminder.

Frequently asked questions

What must an acceptance record contain?

The item, date, participants, result of the inspection, defects with deadlines, reservations and the signatures of both sides.

What happens if one side does not sign?

Then the reason should be noted in the record. The legal consequences depend on the contract and should be checked if in doubt.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Acceptance record. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/acceptance-record/

Short form

Hain, D. (n.d.): Acceptance record. PMDecoder. https://pmdecoder.com/en/glossary/acceptance-record/ (retrieved 24 November 2026)

BibTeX
@misc{acceptancerecord,
  author  = {Hain, Dennis},
  title   = {Acceptance record},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/acceptance-record/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/acceptance-record/">
  <p>Written documentation of an acceptance with the item inspected, result, defects found, deadlines and signatures</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/acceptance-record/">Acceptance record</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.