Cost management plan

Definition

In PMI usage, the cost management plan is a component of the project management plan and sets the rules by which costs in the project are estimated, budgeted, monitored and controlled. It specifies, for example, units of measure and rounding precision, the intended accuracy of estimates, the link to the organization’s chart of accounts through control accounts, variance thresholds beyond which action must be taken, and the rules of performance measurement, such as whether and how earned value management is used. Reporting formats and frequencies as well as responsibilities are added. The plan itself contains no cost figures; these are found in the budget and the cost baseline.

Equivalents in other frameworks

Concept Setting costs by time and project component · three frameworks reviewed

Equivalents of Cost management plan in other frameworks
FrameworkTerm thereRelationNote
generalCost planningpartially overlappingdenotes the plan containing the rules for estimating, budgeting and controlling costs
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Cost management plan

Distinction

The concept of cost planning covers setting costs by time and project component. The cost management plan covers only part of it: it governs how this planning is done but does not provide its result. The figures themselves are found in the project budget and the cost baseline, and the processes in cost management as a whole.

In practice

For an infrastructure project, the cost management plan specifies that costs are reported in thousands of euros without decimals, that every control account is mapped to a cost centre in financial accounting, and that percent complete is measured using the 0/50/100 rule. Deviations of more than ten percent in the cost performance index trigger a root cause analysis. When one trade falls below this value, it is immediately clear who has to act.

Frequently asked questions

Does the cost management plan contain the budget?

No. It describes rules and procedures. The budget and the cost baseline are separate results of cost planning, produced and updated according to these rules.

Why are thresholds set in the cost management plan?

So that it is clear before the project starts what level of deviation requires a response and who triggers it. Without such limits, every deviation is renegotiated, or larger problems are noticed too late.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Cost management plan. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/cost-management-plan/

Short form

Cost management plan (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/cost-management-plan/ (retrieved 24 November 2026)

BibTeX
@misc{costmanagementplan,
  title   = {Cost management plan},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/cost-management-plan/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/cost-management-plan/">
  <p>Subsidiary plan of the project management plan with the rules for cost estimating, budgeting and cost control, such as accuracy, units and thresholds.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/cost-management-plan/">Cost management plan</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.