Project management information system

Definition

In PMI usage, the project management information system (PMIS) is an information system whose tools and techniques collect, integrate and distribute the results of project management work. It includes, for example, software for scheduling and resources, tools for cost and earned value, task and backlog management, document storage, configuration and change management, and reports and dashboards. The PMIS is usually provided by the organization and then forms part of the project's environment; the project decides how it will be used.

Equivalents in other frameworks

Concept Software environment for project data · one framework reviewed

Equivalents of Project management information system in other frameworks
FrameworkTerm thereRelationNote
generalProject management information systemequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Project management information system

Distinction

The term corresponds to the cross-framework term project management information system. The management information system in ISO 21506 is broader and serves the organization as a whole, not only the control of projects. A single tool, such as a scheduling program, is only one component of the PMIS. The configuration management system is usually part of it.

In practice

An energy utility runs a shared platform for all its grid expansion projects. Project managers maintain schedules and risks there, site teams report progress via tablets, and accounting loads actual costs from the ERP system every night. From this, earned value indicators and a portfolio overview for senior management are produced automatically. New projects receive an induction at the start on which data they must maintain and when.

Frequently asked questions

Does a PMIS have to be a single piece of software?

No. It often consists of several connected tools. What matters is that the data are consistent and everyone knows where the authoritative version of a plan or document is kept.

What should be considered when introducing a PMIS?

The processes should be clarified before the tool is chosen. A system that does not fit the processes or is too laborious to maintain will be bypassed, and the data will lose their value.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Project management information system. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/project-management-information-system-pmi/

Short form

Project management information system (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/project-management-information-system-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{projectmanagementinformationsystempmi,
  title   = {Project management information system},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/project-management-information-system-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/project-management-information-system-pmi/">
  <p>Set of tools, such as scheduling, cost tracking, document storage and dashboards, in which a project's management data are brought together.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/project-management-information-system-pmi/">Project management information system</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.