Analyze phase
Definition
In the Analyze phase the team looks for the reasons why the process misses its target. First, possible influencing factors are collected, for instance with a cause-and-effect diagram, a closer process analysis or conversations with those involved. The data are then used to test which of these assumptions hold and how strongly a factor actually affects the result. Depending on the data, simple displays such as Pareto charts or statistical methods such as hypothesis tests and regression are used. The aim is to separate the few decisive factors from the many insignificant ones. The tollgate checks whether the causes are confirmed and not merely assumed.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- Broader term
- DMAIC
- this term
- Analyze phase
Distinction
Root cause analysis as a general method can be applied in any project and to any problem; the Analyze phase is its fixed place in the DMAIC approach and requires causes to be confirmed statistically. It is deliberately separate from the Improve phase: solutions are only developed once the causes are established.
In practice
An energy supplier wants to send out fewer incorrect bills. The team first suspects input errors in customer service. Evaluating three months of data shows, however, that two thirds of the errors arise when meters are replaced, because the old meter reading reaches the system too late. A comparison of regions confirms that the error rate rises with the time this transfer takes.
Frequently asked questions
Why are experience and gut feeling not enough?
Because obvious assumptions are often wrong or incomplete. Only testing with data shows whether a measure addresses the right point.
Does every analysis need complex statistics?
No. Well-prepared frequencies and charts are often enough. More elaborate methods are chosen when several factors interact or differences are small.
Source and context
- Reference
- ISO 13053-1:2011
- Edition
- ISO 13053-1:2011 (DMAIC methodology)
Cite this entry
Analyze phase. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/analyze-phase/
Analyze phase (n.d.). PMDecoder, entry on ISO 13053-1:2011. https://pmdecoder.com/en/glossary/analyze-phase/ (retrieved 24 November 2026)
@misc{analyzephase,
title = {Analyze phase},
note = {PMDecoder, ISO 13053-1:2011},
url = {https://pmdecoder.com/en/glossary/analyze-phase/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/analyze-phase/"> <p>Third DMAIC phase: the main causes of variation and defects are identified from the measurement data and confirmed with evidence.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/analyze-phase/">Analyze phase</a>, PMDecoder, ISO 13053-1:2011</footer> </blockquote>
Found a mistake? Let us know, we check every report.