FMEA
also: Failure mode and effects analysis
Definition
In an FMEA, a cross-functional team examines step by step how a product, component or process could fail, what the consequences would be and what would trigger the failure. Each failure mode is rated for the severity of its effect, the likelihood of occurrence and the likelihood of detection. Traditionally the product of these three ratings served as the risk priority number; more recent automotive industry guidelines instead rank by means of a table of action priorities. Actions are derived from the resulting ranking.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- this term
- FMEA
- Topic area
- Quality
Distinction
A design FMEA looks at designs, a process FMEA at manufacturing and work processes. The FMEA is preventive, whereas root cause analysis investigates failures that have already occurred. Compared with a general risk analysis, it is considerably more detailed and tailored to technical failure chains.
In practice
When developing a new coffee machine, the team carries out a design FMEA for the heating circuit. One failure mode reads: thermal fuse does not trip, effect overheating and fire hazard, cause incorrectly rated fuse. Severity is rated ten, occurrence three and detection six. The team decides on a second, independent cut-off and an additional test step in production, after which detection is rated two.
Frequently asked questions
When should an FMEA be carried out?
As early as possible, while the design or process can still be changed, and again whenever significant changes are made.
Who takes part in an FMEA?
Specialists from development, production, quality, service and, where needed, purchasing or suppliers, led by a facilitator experienced in the method.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). FMEA. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/fmea/
Hain, D. (n.d.): FMEA. PMDecoder. https://pmdecoder.com/en/glossary/fmea/ (retrieved 24 November 2026)
@misc{fmea,
author = {Hain, Dennis},
title = {FMEA},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/fmea/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/fmea/"> <p>Preventive analysis method that assesses possible failures of a product or process, their effects and causes before they occur</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/fmea/">FMEA</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.