Budget at completion

abbr. BAC

Definition

Budget at completion is the sum of all approved budget values assigned to an activity, a work package, a control account, a project or a programme over its entire duration. It states what the work is supposed to cost in total according to the approved plan and marks the end point of the planned value curve in earned value management. For the project as a whole, it is the sum of all control accounts plus any budget not yet distributed. Since Amendment 1 of 2026, the standard stresses that it is the approved budget and that the term applies at every level, from a single activity to a whole programme.

Equivalents in other frameworks

Concept Total budget of the planned work · one framework reviewed

Equivalents of Budget at completion in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKBudget at completionequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Budget at completion

Distinction

Budget at completion is a planning figure and changes only when the baseline is formally revised. The estimate at completion, by contrast, is a forecast that takes performance to date into account; the difference between the two is the variance at completion. It differs from the overall project budget in that the management reserve is not included.

In practice

A control account for electrical installation in a new hospital building comprises three work packages with budgets of 180,000, 240,000 and 95,000 euros, so its budget at completion is 515,000 euros. When the client orders additional emergency power circuits, a fourth work package of 40,000 euros is planned after the change has been approved, and the budget at completion rises to 555,000 euros. Extra costs caused by slower installation, on the other hand, do not change it; they show up in the forecast.

Frequently asked questions

Why is it called budget "at completion"?

Because the figure shows the planned value the work reaches once it is fully done. At the end, cumulative planned value equals exactly this budget.

Is the management reserve part of budget at completion?

No. The management reserve is held outside the performance measurement baseline and is only assigned to a control account once it has been released; only then does it increase that account's budget.

Source and context

Reference
ISO 21506:2024/Amd 1:2026, 3.7
Edition
ISO 21506:2024
Cite this entry
APA

Hain, D. (n.d.). Budget at completion. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/budget-at-completion/

Short form

Hain, D. (n.d.): Budget at completion. PMDecoder, entry on ISO 21506:2024/Amd 1:2026, 3.7. https://pmdecoder.com/en/glossary/budget-at-completion/ (retrieved 24 November 2026)

BibTeX
@misc{budgetatcompletion,
  author  = {Hain, Dennis},
  title   = {Budget at completion},
  note    = {PMDecoder, ISO 21506:2024/Amd 1:2026, 3.7},
  url     = {https://pmdecoder.com/en/glossary/budget-at-completion/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/budget-at-completion/">
  <p>Approved total budget for completing all the work of an activity, work package, control account, project or programme.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/budget-at-completion/">Budget at completion</a>, PMDecoder, ISO 21506:2024/Amd 1:2026, 3.7</footer>
</blockquote>

Found a mistake? Let us know, we check every report.