Waterfall model
Definition
In the waterfall model, phases such as requirements analysis, design, implementation, testing and commissioning follow one another. Each phase ends with defined results that are reviewed and approved before the next one begins. Going back is not intended or allowed only in exceptional cases. The name evokes the image of steps down which water can only flow downwards.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- Broader term
- Process model
- this term
- Waterfall model
- Topic area
- Approaches and agility
Distinction
The V-model assigns a corresponding test phase to each design phase, whereas the waterfall model merely lines the phases up one after another. Iterative and agile approaches repeat cycles and explicitly allow feedback. A frequently cited paper by Winston Royce from 1970 is regarded as its origin, although it actually described the limits of a purely sequential process.
In practice
A manufacturer of industrial scales develops the firmware for a certified measuring instrument using the waterfall model. Requirements and design are fully documented and assessed by the testing body before programming starts. Late changes would be expensive, because every change triggers a new assessment. The strictly sequential approach suits this case, while for the accompanying customer app the company chooses short cycles instead.
Frequently asked questions
When does the waterfall model fit?
When requirements are stable and well known, evidence is required for audits or certification, and late changes would be very expensive.
What is the model's greatest weakness?
Errors from early phases often only come to light during testing, when corrections take a great deal of effort.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Waterfall model. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/waterfall-model/
Hain, D. (n.d.): Waterfall model. PMDecoder. https://pmdecoder.com/en/glossary/waterfall-model/ (retrieved 24 November 2026)
@misc{waterfallmodel,
author = {Hain, Dennis},
title = {Waterfall model},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/waterfall-model/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/waterfall-model/"> <p>Process model in which the phases of a project are passed through strictly in sequence, each building on the completed previous one</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/waterfall-model/">Waterfall model</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.