Special cause

also: Assignable cause

Definition

A special cause is an event that is not part of normal process behaviour: a defective tool, a new batch of material, an operating error or a changed setting. It leads to values outside the control limits or to conspicuous patterns such as trends or shifts. Because it can be identified concretely, it can be investigated and removed in a targeted way, so that the process returns to its stable state.

Equivalents in other frameworks

No equivalents have been recorded for this term yet.

Classification

this term
Special cause
Topic area
Quality

Distinction

Common causes act constantly and produce the normal variation; special causes occur in addition and usually irregularly. Root cause analysis is the approach used to find a special cause. In the literature it is also called an assignable or systematic cause.

In practice

In a project to improve a painting line, the control chart of coating thickness shows a clear downward shift on a Tuesday. The team asks what changed on that day and finds out that a new batch of paint from a different supplier was used. After returning to the previous batch, the values are back in the usual range. Purchasing adds an incoming inspection for new batches to its procedures.

Frequently asked questions

What do you do if a special cause is suspected?

Investigate the process, determine the cause, remove it and check whether it can occur again. Affected results should be assessed separately.

Can a special cause also be positive?

Yes. An unexpectedly good value can point to an improvement that one wants to understand and use permanently.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Special cause. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/special-cause/

Short form

Hain, D. (n.d.): Special cause. PMDecoder. https://pmdecoder.com/en/glossary/special-cause/ (retrieved 24 November 2026)

BibTeX
@misc{specialcause,
  author  = {Hain, Dennis},
  title   = {Special cause},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/special-cause/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/special-cause/">
  <p>Individual, identifiable influence that changes a process unusually and shows up as an anomaly on the control chart</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/special-cause/">Special cause</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.