Competence element: Design

Definition

The competence element Design describes how someone weighs the needs, expectations and influences of the organizations involved and uses them to draft the basic set-up of a project. This design determines how the project is established, organized and managed, and takes into account resources, funding, stakeholder objectives, benefits, risks, governance and priorities, among other things. The ICB requires clarifying success criteria, drawing on experience from earlier projects, assessing complexity and, depending on it, selecting and tailoring a suitable management approach. Because the context and success criteria change over time, the design is reviewed regularly. The element comprises five key competence indicators.

Equivalents in other frameworks

No equivalents have been recorded for this term yet.

Classification

Broader term
Practice
this term
Competence element: Design

Distinction

A process model such as waterfall, agile or hybrid is one possible building block of the project design; the competence element also covers organization, control and measures of success. It shares with tailoring in PM² the idea of adapting the approach to the specific project. Detailed planning itself is covered by the competence element Plan and control.

In practice

An automotive supplier starts a project for a new battery housing. At the outset, the project manager assesses the complexity: new materials, two sites and a customer with fixed series production dates. She opts for a phase model with approvals for tool making and series start-up, and for short iterations in the design work. After the customer doubles the volumes, she revises the design and sets up a separate working group for procurement.

Frequently asked questions

When is the project design created?

At the start of the project, before detailed planning. However, the ICB envisages reassessing it regularly during the project and adjusting it where necessary.

What role do lessons learned play?

Experience from other projects should feed into the design. The ICB also expects one's own insights to be shared with other projects.

Source and context

Reference
IPMA ICB 4.0, Abschnitt 4.5.1
Edition
IPMA Individual Competence Baseline 4.0
Cite this entry
APA

Competence element: Design. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/competence-element-design/

Short form

Competence element: Design (n.d.). PMDecoder, entry on IPMA ICB 4.0, Abschnitt 4.5.1. https://pmdecoder.com/en/glossary/competence-element-design/ (retrieved 24 November 2026)

BibTeX
@misc{competenceelementdesign,
  title   = {Competence element: Design},
  note    = {PMDecoder, IPMA ICB 4.0, Abschnitt 4.5.1},
  url     = {https://pmdecoder.com/en/glossary/competence-element-design/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/competence-element-design/">
  <p>ICB 4 practice competence: deriving a project's management approach from requirements and context and adjusting it regularly</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/competence-element-design/">Competence element: Design</a>, PMDecoder, IPMA ICB 4.0, Abschnitt 4.5.1</footer>
</blockquote>

Found a mistake? Let us know, we check every report.