Andon
Definition
Andon originally denotes a lamp and today generally a signalling system with which employees or machines indicate a problem. In manufacturing, employees pull a cord or press a button when they notice a defect or cannot keep to the takt; a display board shows the location and type of the problem. A supervisor comes over and decides whether the process is stopped. Andon requires that reporting problems is welcome and not punished. It is the tool with which the principle of autonomation is put into practice every day.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Distinction
Autonomation is the principle of stopping when defects occur, andon the signal for it. A warning message in software informs, whereas an andon calls for immediate action. In Kanban, marking blocked work on the board serves a similar purpose, but usually without a defined, immediate response.
In practice
In a data centre relocation project, the team agrees: anyone who encounters an unexpected problem when moving a server sets an agreed signal in the shared channel. Within ten minutes the shift lead joins and decides whether the move continues or is rolled back. In this way, small problems are solved before several systems are affected.
Frequently asked questions
Doesn’t andon lead to constant interruptions?
At first, many problems are often reported because they become visible for the first time. If their causes are consistently removed, the number of signals falls over time.
What does andon need besides the signal?
A reliable response: someone has to come and help at short notice. A signal to which nobody responds soon stops being used.
Source and context
Cite this entry
Andon. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/andon/
Andon (n.d.). PMDecoder. https://pmdecoder.com/en/glossary/andon/ (retrieved 24 November 2026)
@misc{andon,
title = {Andon},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/andon/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/andon/"> <p>Visible or audible signal used to report a problem at the workplace immediately so that help arrives and the problem is solved.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/andon/">Andon</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.