Configuration management system
Definition
At PMI, the configuration management system comprises the procedures for tracking project artifacts and for monitoring and controlling any changes made to them. It defines which items are under configuration control, how they are identified and versioned, how their status is documented and how their conformance with requirements is checked. This makes it clear at any time which version of a plan, specification or product component is valid. The system is often part of the project management information system and works closely with change control.
Equivalents in other frameworks
Concept Managing components and versions of a result · two frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| ISO 21506 | Configuration management | closely related | denotes the set of rules with procedures and tools, not the activity itself |
| PRINCE2 | Product Register | partially overlapping | Record of products with version and status on which configuration management relies. |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Configuration management system
- Topic area
- Monitoring and control
Distinction
The concept is listed in the glossary under “Konfigurationsmanagement” (configuration management) according to ISO 21506; the PMI term is closely related because it denotes the system of procedures and tools rather than the discipline as a whole. Change control decides on changes; the configuration management system ensures that versions and changes remain traceable.
In practice
When developing a medical device, the project records every drawing, software version and test specification with an identifier and version. When a batch of faulty sensors is discovered, the configuration data make it possible to determine exactly which delivered devices contain which sensor version, and only those are recalled.
Frequently asked questions
What is typically placed under configuration control?
Everything whose valid version is binding for others: baselines, specifications, drawings, source code, test specifications and released deliverables. Working notes are usually not included.
Is a configuration management system a piece of software?
Not necessarily. It mainly refers to procedures and responsibilities. Tools such as version control or document management support them but do not replace them.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Configuration management system. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/configuration-management-system/
Configuration management system (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/configuration-management-system/ (retrieved 24 November 2026)
@misc{configurationmanagementsystem,
title = {Configuration management system},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/configuration-management-system/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/configuration-management-system/"> <p>Framework of procedures stating which project artifacts are under version control and how their valid state and any changes to it are safeguarded.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/configuration-management-system/">Configuration management system</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.