PM² Mindsets

Definition

The PM² Mindsets describe attitudes and behaviours that project teams should use as a guide when making decisions. They connect the processes and practices of the methodology with shared beliefs and values. They include, for example, the ideas that methods serve the project and not the other way round, that results of the highest possible value matter more than merely following plans, that roles are assigned according to suitability and that knowledge is shared. In addition, the guide poses guiding questions, such as whether everyone knows why they are doing something, or whether everything really is equally important.

Equivalents in other frameworks

No equivalents have been recorded for this term yet.

Distinction

The Mindsets are not rules whose observance is checked but a source of orientation. In this respect they resemble the values in the Scrum Guide or the principles of other frameworks. They can be recorded for a specific project in the Project Handbook.

In practice

At the Planning Kick-off Meeting of a public administration project, the Project Manager raises the guiding question of whether everything is equally important. The team agrees on three functions without which the system must not go live and moves twelve further wishes to a second stage. The agreement is then recorded in the Project Handbook.

Frequently asked questions

Why does a methodology need Mindsets?

Processes and templates alone do not say how to decide in unclear situations. The Mindsets are a reminder of what matters for success and prevent the methodology from being followed only formally.

How many Mindsets are there?

Guide 3.1 lists eleven guiding principles and supplements them with ten guiding questions with advice for practice.

Source and context

Reference
PM²-Leitfaden 3.1, Abschnitt 3.5
Edition
PM² Guide 3.1
Cite this entry
APA

PM² Mindsets. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/pm2-mindsets/

Short form

PM² Mindsets (n.d.). PMDecoder, entry on PM²-Leitfaden 3.1, Abschnitt 3.5. https://pmdecoder.com/en/glossary/pm2-mindsets/ (retrieved 24 November 2026)

BibTeX
@misc{pm2mindsets,
  title   = {PM² Mindsets},
  note    = {PMDecoder, PM²-Leitfaden 3.1, Abschnitt 3.5},
  url     = {https://pmdecoder.com/en/glossary/pm2-mindsets/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/pm2-mindsets/">
  <p>Attitudes and ways of thinking that help PM² project teams concentrate on what really matters for project success</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/pm2-mindsets/">PM² Mindsets</a>, PMDecoder, PM²-Leitfaden 3.1, Abschnitt 3.5</footer>
</blockquote>

Found a mistake? Let us know, we check every report.