Design for Six Sigma

abbr. DFSS

Definition

Design for Six Sigma, DFSS for short, applies Six Sigma thinking to development. Instead of improving an existing process, a product, service or process is designed so that it meets customer requirements from the outset with little variation. The starting point is the customer requirements that have been gathered and the critical-to-quality characteristics derived from them. A widely used cycle is DMADV: Define, Measure, Analyze, Design and Verify. There are also other variants with different phase names. Typical tools are methods for translating customer wishes into technical characteristics, risk analyses of the design and design of experiments.

Equivalents in other frameworks

Concept Defined framework for how a project proceeds · two frameworks reviewed

Equivalents of Design for Six Sigma in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKMethodologypartially overlappingSpecial form of a methodology for developing new products and processes, usually following the DMADV cycle.
generalProcess modelpartially overlappingSpecial form of a methodology for developing new products and processes, usually following the DMADV cycle.

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Other terms

Other words for the same thing in English usage. Not to be confused with the equivalents above, which translate between frameworks.

DFSS
abbreviation
DMADVcommon cycle within DFSS
related, not equivalent

Classification

this term
Design for Six Sigma

Distinction

DMAIC presupposes that a process exists and can be measured; DFSS is used when something new is being created or when a process is so fundamentally unsuitable that improvement is not enough. DFSS shares its customer focus with design thinking but relies more on measurable characteristics and statistical assurance.

In practice

A utility introduces a new online application for house connections. Using DFSS, the team first establishes what builders and installers need and derives characteristics from this, such as no more than five days until a binding appointment is confirmed. The design is checked with a risk analysis, tested in a trial run and released only after the target values have been demonstrated.

Frequently asked questions

What does DMADV stand for?

Define, Measure, Analyze, Design and Verify. The first three phases resemble DMAIC but relate to requirements and design alternatives rather than to a running process.

Is DFSS only intended for industrial products?

No. It is also used for services, administrative procedures and software, wherever something new with measurable requirements is being created.

Source and context

Cite this entry
APA

Design for Six Sigma. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/design-for-six-sigma/

Short form

Design for Six Sigma (n.d.). PMDecoder. https://pmdecoder.com/en/glossary/design-for-six-sigma/ (retrieved 24 November 2026)

BibTeX
@misc{designforsixsigma,
  title   = {Design for Six Sigma},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/design-for-six-sigma/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/design-for-six-sigma/">
  <p>Six Sigma approach for developing new products, services or processes that are meant to meet customer requirements reliably from the start.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/design-for-six-sigma/">Design for Six Sigma</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.