Kanban practices

Definition

The Kanban Guide describes Kanban through three practices that work together. First, the members define what flow means in their environment, record this in the Definition of Workflow and make it visible, usually on a Kanban board. Second, they actively manage the work in the workflow: they limit work in progress, make sure that work items do not sit idle for longer than necessary and resolve blockers. Third, they continuously improve the workflow so that effectiveness, efficiency and predictability are better balanced, supported by the flow metrics. Together, the practices as applied form a Kanban system. Other methods may be added as long as the minimum practices are retained.

Equivalents in other frameworks

No equivalents have been recorded for this term yet.

Classification

Broader term
Kanban system
this term
Kanban practices

Distinction

In its Kanban Method, Kanban University describes six general practices and additional principles; the Kanban Guide deliberately limits itself to three. Unlike the events in Scrum, the practices do not set fixed meetings: reviews may take place continuously or at intervals.

In practice

A marketing team introduces Kanban in three steps. It first describes what counts as a campaign element, when an element starts and ends and which states lie in between, and maps this on a board. It then limits the elements in design to five and discusses every morning which pieces of work are stuck. After six weeks, it evaluates how long elements take and removes a duplicate approval loop.

Frequently asked questions

In what order are the practices introduced?

The Kanban Guide does not prescribe an order. The three practices work together; what matters is that all of them are applied.

Are meetings part of the Kanban practices?

Not as a requirement. Many teams review their work regularly, but the Kanban Guide leaves open whether this happens continuously, at fixed intervals or both.

Source and context

Reference
Kanban Guide 2025.5, Abschnitt Kanban Practices
Edition
The Kanban Guide, May 2025

Differences from other editions

The Kanban Guide, December 2020
Practices and measures were considered immutable; in the guide’s view, adopting only some of them did not amount to Kanban. Active management explicitly also included preventing work items from accumulating in individual sections of the workflow.
Cite this entry
APA

Kanban practices. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/kanban-practices/

Short form

Kanban practices (n.d.). PMDecoder, entry on Kanban Guide 2025.5, Abschnitt Kanban Practices. https://pmdecoder.com/en/glossary/kanban-practices/ (retrieved 24 November 2026)

BibTeX
@misc{kanbanpractices,
  title   = {Kanban practices},
  note    = {PMDecoder, Kanban Guide 2025.5, Abschnitt Kanban Practices},
  url     = {https://pmdecoder.com/en/glossary/kanban-practices/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/kanban-practices/">
  <p>The three practices of the Kanban Guide: defining and visualizing the workflow, actively managing work in the workflow and improving the workflow</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/kanban-practices/">Kanban practices</a>, PMDecoder, Kanban Guide 2025.5, Abschnitt Kanban Practices</footer>
</blockquote>

Found a mistake? Let us know, we check every report.