Acceptance criteria
Definition
In PMI usage, acceptance criteria state the conditions a deliverable has to satisfy before it can be accepted. They make it verifiable when a result meets expectations, for example through performance values, functions, quality characteristics or regulations to be observed. In predictive projects they are usually recorded in the description of the project scope, in agile approaches often per user story. The stakeholders who will accept the result should be involved in defining them, so that later acceptance does not fail because of differing expectations.
Equivalents in other frameworks
Concept Criteria for a finished result · three frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| general | Acceptance criteria | equivalent | — |
| PM² | Deliverables Acceptance Management Plan | partially overlapping | plan that, in addition to the criteria, also defines the steps, responsibilities and dates of acceptance |
| Scrum | Definition of Done | partially overlapping | serves as the quality standard for every Increment of a product, not for an individual deliverable |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Acceptance criteria
- Topic area
- Scope and requirements
Distinction
The term corresponds to acceptance criteria in general usage. The definition of done in Scrum applies equally to all of a team's work results, whereas acceptance criteria apply to a specific deliverable or requirement. Requirements describe what is needed, acceptance criteria how fulfilment is measured. Validation then formally checks whether the criteria are met.
In practice
For a new online appointment booking system at a medical practice, acceptance criteria are defined: appointments can be booked in no more than three steps, the site works on smartphones, confirmations arrive by email within one minute and health data are stored in encrypted form. At acceptance, the practice manager checks each criterion; because confirmations arrive late, acceptance is only given after a correction.
Frequently asked questions
What makes good acceptance criteria?
They are unambiguous, measurable or testable and agreed in advance. Wording such as “user-friendly” or “fast” is not enough; specific values or observable conditions are needed.
When should acceptance criteria be defined?
Before work on the result in question begins. If they are only discussed at acceptance, disputes and rework are likely.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Acceptance criteria. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/acceptance-criteria-pmi/
Acceptance criteria (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/acceptance-criteria-pmi/ (retrieved 24 November 2026)
@misc{acceptancecriteriapmi,
title = {Acceptance criteria},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/acceptance-criteria-pmi/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/acceptance-criteria-pmi/"> <p>Checkable standards, agreed in advance, that decide at acceptance whether a deliverable can be taken over.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/acceptance-criteria-pmi/">Acceptance criteria</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.