PDCA cycle
also: Deming cycle · abbr. PDCA
Definition
The PDCA cycle describes improvement as a recurring loop. First a problem is examined and a change is planned, then it is tried out on a small scale, then checked by means of measurements, and finally adopted as the standard or adjusted before the next pass begins. The idea goes back to Walter A. Shewhart and was popularized by W. Edwards Deming, which is why it is also called the Deming cycle.
Equivalents in other frameworks
Concept Cycle of plan, do, check and act · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Plan-Do-Check-Act | equivalent | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- PDCA cycle
- Topic area
- Quality
Distinction
The PDCA cycle is a general improvement principle, not a project method; projects can, however, themselves be understood as one large pass. Iterations in agile approaches follow a similar logic of planning, doing and checking. Lean and Six Sigma use related cycles with their own steps.
In practice
A data centre suffers frequent outages after software updates. In the planning step, the team decides to install updates on a test environment first in future. This is initially done for one system. The check after one month shows no further outages, but a delay of one day per update. In the act step, the procedure is adopted for all systems and supplemented with a fast track for security updates.
Frequently asked questions
What do the four letters stand for?
Plan, Do, Check and Act.
Where is the PDCA cycle used?
In quality management, in continual improvement, in pilot schemes and wherever changes are to be tried out step by step.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). PDCA cycle. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/pdca-cycle/
Hain, D. (n.d.): PDCA cycle. PMDecoder. https://pmdecoder.com/en/glossary/pdca-cycle/ (retrieved 24 November 2026)
@misc{pdcacycle,
author = {Hain, Dennis},
title = {PDCA cycle},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/pdca-cycle/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/pdca-cycle/"> <p>Four-stage cycle of planning, doing, checking and acting for continual improvement</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/pdca-cycle/">PDCA cycle</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.