Activity sequence plan
Definition
The activity sequence plan records which activities build on one another, which can run in parallel and which dependencies exist. It is the result of activity sequencing, which follows on from the work breakdown and precedes scheduling. It is usually presented as a network diagram, and for simple undertakings also as a list of predecessors and successors.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Other terms
Other words for the same thing in English usage. Not to be confused with the equivalents above, which translate between frameworks.
- Activity sequencing
- related, not equivalent
Classification
- this term
- Activity sequence plan
- Topic area
- Scheduling
Distinction
The work breakdown structure shows what has to be done, the activity sequence plan in what order, and the schedule exactly when. A flowchart for business processes describes recurring processes with branches, whereas the sequence plan in a project describes a one-off sequence. In practice, the sequence plan and the schedule are often created in the same step.
In practice
For the conversion of a medical practice, the architect first sets out the sequence: demolition, then electrical and plumbing installation in parallel, followed by drywall, screed, painter and floor layer, and finally furniture and medical equipment. Only in a second step does he assign durations and dates. In doing so, he notices that the screed has to dry for several weeks before the floor may be laid. This waiting time is entered explicitly in the sequence.
Frequently asked questions
Why plan the sequence separately from the dates?
Because the logic of the order changes less often than the dates. A clean sequence plan makes it possible to recalculate quickly when delays occur.
What information does an activity sequence plan need?
The activities, their predecessors and successors, the type of each link and any waiting times.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Activity sequence plan. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/activity-sequence-plan/
Hain, D. (n.d.): Activity sequence plan. PMDecoder. https://pmdecoder.com/en/glossary/activity-sequence-plan/ (retrieved 24 November 2026)
@misc{activitysequenceplan,
author = {Hain, Dennis},
title = {Activity sequence plan},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/activity-sequence-plan/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/activity-sequence-plan/"> <p>Representation of the logical order and dependencies of a project's activities, as yet without specific dates</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/activity-sequence-plan/">Activity sequence plan</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.