Voice of the Customer
abbr. VOC
Definition
Voice of the Customer, VOC for short, refers both to what customers say about a process or product and to the systematic gathering of these statements. Sources include interviews, surveys, complaints, feedback in service, observation of use or market data. The statements are first collected unchanged and then grouped by topic. Because customers often speak in general terms, such as “fast” or “reliable”, the statements are then translated into concrete needs and finally into measurable characteristics with target values. Customers can also be internal recipients of a process output, such as a downstream department.
Equivalents in other frameworks
Concept Condition a result must meet · two frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Requirement | partially overlapping | Precursor of requirements: customers’ statements and expectations in their own words, before measurable requirements are derived. |
| general | Requirement | partially overlapping | Precursor of requirements: customers’ statements and expectations in their own words, before measurable requirements are derived. |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Voice of the Customer
- Topic area
- Scope and requirements
Distinction
A requirement is a defined, verifiable condition. The Voice of the Customer is its precursor: it captures what customers say and expect before requirements and critical-to-quality characteristics are derived from it. A customer satisfaction survey can be one source but does not cover the VOC on its own.
In practice
A city administration wants to improve the issuing of residents’ parking permits. The team evaluates 300 complaints and holds short conversations at the counter. Frequent statements are “too many documents” and “you never know when the permit will arrive”. Two needs emerge from this, a simple application and a reliable processing time, for which the team then defines measures.
Frequently asked questions
Is it enough to ask customers what they want?
Often not. Taken-for-granted expectations are rarely mentioned, and some needs only become apparent through observation. That is why several sources are combined.
In which phase is the VOC gathered?
Mainly in the DMAIC Define phase and at the start of Design for Six Sigma. It is supplemented selectively later if needed.
Source and context
- Reference
- ISO 13053-2:2011
- Edition
- ISO 13053-2:2011 (tools and techniques)
Cite this entry
Voice of the Customer. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/voice-of-the-customer/
Voice of the Customer (n.d.). PMDecoder, entry on ISO 13053-2:2011. https://pmdecoder.com/en/glossary/voice-of-the-customer/ (retrieved 24 November 2026)
@misc{voiceofthecustomer,
title = {Voice of the Customer},
note = {PMDecoder, ISO 13053-2:2011},
url = {https://pmdecoder.com/en/glossary/voice-of-the-customer/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/voice-of-the-customer/"> <p>Systematically gathered needs, expectations and complaints of a process’s customers, in their own words, as the starting point for measurable requirements.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/voice-of-the-customer/">Voice of the Customer</a>, PMDecoder, ISO 13053-2:2011</footer> </blockquote>
Found a mistake? Let us know, we check every report.