Minimum viable product

abbr. MVP

Definition

A minimum viable product contains only the functions needed to test a central assumption about benefit and demand with real users. It is made available quickly and with little effort, and the feedback and usage data decide the way forward: expand, change or abandon. The term became known above all through the Lean Startup approach.

Equivalents in other frameworks

Concept Simplest product version for learning · one framework reviewed

Equivalents of Minimum viable product in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKMinimum viable productequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Minimum viable product

Distinction

A prototype is often used for internal tests and need not be usable, whereas a minimum viable product is used by real users. A first release stage in a traditional project is planned and firmly commissioned; the MVP is explicitly an experiment. Minimal does not mean deficient: what it does should work reliably.

In practice

A bakery chain is considering developing an app for pre-orders. Instead of a complete app, it starts with a simple online form for three branches, whose orders are sent to the branches by e-mail. After four weeks it becomes clear that almost only customers of one branch at the railway station place orders, and mainly in the morning. The chain then develops a targeted pick-up function for commuters instead of a comprehensive app.

Frequently asked questions

How small may an MVP be?

Small enough to be available quickly, and large enough for users to experience real benefit and for the central assumption actually to be tested.

Is an MVP compatible with fixed-price projects?

Only to a limited extent, because the further scope depends on what is learned. The MVP is therefore often commissioned as a separate, self-contained stage.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Minimum viable product. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/minimum-viable-product/

Short form

Hain, D. (n.d.): Minimum viable product. PMDecoder. https://pmdecoder.com/en/glossary/minimum-viable-product/ (retrieved 24 November 2026)

BibTeX
@misc{minimumviableproduct,
  author  = {Hain, Dennis},
  title   = {Minimum viable product},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/minimum-viable-product/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/minimum-viable-product/">
  <p>First, deliberately simple version of a product that does just enough to learn from real users whether the idea works</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/minimum-viable-product/">Minimum viable product</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.