Quality audit

Definition

In PMI terms, a quality audit is a structured and independent review of whether work on the project complies with the applicable policies, processes and procedures of the organization and the project. It is part of quality assurance and focuses on the approach rather than on individual results. Its aims are to identify and share good practices, uncover deviations and gaps, and prompt improvements. It is often carried out by people outside the project team, for example from the project management office, the quality department or external auditors, either as scheduled or when a specific need arises.

Equivalents in other frameworks

Concept Independent review of a project · one framework reviewed

Equivalents of Quality audit in other frameworks
FrameworkTerm thereRelationNote
generalProject auditpartially overlappingis limited to quality processes and rules, whereas the project audit considers the whole project

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Quality audit
Topic area
Quality

Distinction

A quality audit is a special form of the cross-framework project audit, limited to compliance with quality-related requirements; a project audit can also examine economic viability, schedules or governance. Unlike quality control, it does not inspect deliverables but processes. It should not be equated with a certification audit against a management system standard.

In practice

Halfway through a software project, a colleague from the quality department checks whether code reviews, test records and approvals are carried out as the quality management plan requires. She finds that reviews are often skipped for urgent changes and recommends a shortened procedure for urgent cases. The team adopts the recommendation.

Frequently asked questions

Is a quality audit a check on the project manager?

It reviews the approach, not individuals. Done well, it helps the project fix weaknesses early and yields practices that benefit other projects.

When do quality audits take place?

As scheduled, for instance at milestones or at fixed intervals, or when quality problems arise. The quality management plan specifies what is intended.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Quality audit. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/quality-audit/

Short form

Quality audit (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/quality-audit/ (retrieved 24 November 2026)

BibTeX
@misc{qualityaudit,
  title   = {Quality audit},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/quality-audit/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/quality-audit/">
  <p>Independent, structured review of how a project works, revealing departures from applicable rules and good practices worth sharing.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/quality-audit/">Quality audit</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.