Management reserve
Definition
In PMI usage, the management reserve is an amount of money or time withheld outside the performance measurement baseline for management control purposes. It is intended for work that belongs to the project scope but could not be foreseen during planning, the so-called unknown unknowns. The reserve is part of the project budget but not of the cost baseline. Its use is usually decided not by the project manager alone but by a higher authority such as the sponsor or a steering body. When a portion is released, it moves into the baseline through change control. Organizations often set the amount as a flat rate, depending on the novelty and complexity of the undertaking.
Equivalents in other frameworks
Concept Reserve for unforeseen work · three frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| ISO 21506 | Management reserve | equivalent | — |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Management reserve
- Topic area
- Risks and opportunities
Distinction
The management reserve corresponds to the Managementreserve of ISO 21506. The distinction from the contingency reserve is essential: the latter covers identified risks, is part of the baseline and is managed by the project manager. A budget increase for additional scope, on the other hand, is not a matter for the management reserve but an approved change.
In practice
During the introduction of a new point-of-sale system, it turns out that an interface to the parent company’s merchandise management system works differently from its documentation. The adjustment costs 60,000 euros and was not covered by any risk. The project manager applies to the sponsor for release from the management reserve. Once approved, the amount is transferred into the cost baseline through a change request.
Frequently asked questions
Is the management reserve part of earned value calculations?
No. As long as it has not been released, it lies outside the performance measurement baseline and is not included in planned value or budget at completion. Only after release does it become part of the baseline.
May the management reserve be used for new requirements?
Not in the proper sense. It covers unforeseen work within the agreed scope. New requirements extend the scope and need their own approval, usually with additional budget.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Management reserve. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/management-reserve-pmi/
Management reserve (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/management-reserve-pmi/ (retrieved 24 November 2026)
@misc{managementreservepmi,
title = {Management reserve},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/management-reserve-pmi/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/management-reserve-pmi/"> <p>Portion of the project budget or schedule time held back for work that nobody foresaw but that lies within the project scope.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/management-reserve-pmi/">Management reserve</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.