Design thinking
Definition
Design thinking is a human-centred approach to problem solving that PMI associates mainly with clarifying needs and developing solutions. The starting point is a thorough understanding of the people a solution is intended for: their needs, habits and difficulties. From this the actual problem is framed before ideas are collected. Promising ideas are turned into simple prototypes and tried out with real users; the insights lead back to a better understanding or to new ideas. The approach is deliberately repetitive and relies on interdisciplinary teams. In a project context it is especially useful in early stages, when it is still unclear what should be built at all.
Equivalents in other frameworks
Concept User-centred development of solutions · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| general | Design thinking | equivalent | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Design thinking
- Topic area
- Approaches and agility
Distinction
The cross-framework term design thinking describes the same approach; PMI adopts it without defining a variant of its own. An adaptive approach controls delivery in cycles, whereas design thinking serves rather to find the right solution beforehand. Individual creativity techniques are building blocks, not the approach as a whole.
In practice
A health insurer wants to simplify applications for medical aids. Instead of digitizing a form straight away, the project team accompanies insured persons and medical supply stores through real applications. It turns out that the main problem is a lack of feedback on processing status. A paper prototype for status messages is tested with ten insured persons and then added to the project scope.
Frequently asked questions
Is design thinking a project management method?
No. It helps to understand problems and find solutions, but it governs neither schedules nor budgets nor responsibilities. It is therefore combined with a project approach.
Who should take part in design thinking?
A mixed team of specialists from different disciplines and, as early and often as possible, the future users themselves. Without their involvement the approach remains a desk-based assumption.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Design thinking. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/design-thinking-pmi/
Design thinking (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/design-thinking-pmi/ (retrieved 24 November 2026)
@misc{designthinkingpmi,
title = {Design thinking},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/design-thinking-pmi/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/design-thinking-pmi/"> <p>Human-centred approach that understands problems from the users’ perspective and develops solutions step by step through prototypes and tests.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/design-thinking-pmi/">Design thinking</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.