Control chart
also: Shewhart chart, Process control chart
Definition
On a control chart, measured values or statistics from samples are plotted in time order. A centre line shows the average, and an upper and a lower control limit show the range within which a stable process usually varies; they are typically three standard deviations from the mean. Points outside the limits or conspicuous patterns within them indicate special influences. The method goes back to Walter A. Shewhart, who developed it in the 1920s.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- Broader term
- Statistical process control
- this term
- Control chart
- Topic area
- Quality
Distinction
Control limits derive from the process itself, specification limits from the requirements; a process can be stable and still produce scrap. The control chart monitors running processes, whereas a histogram shows the distribution of values without any time order. It helps to distinguish between common and special causes of variation.
In practice
In a project introducing a new beverage filling line, the team monitors the fill volume with a control chart. Every thirty minutes, five bottles are weighed and the mean is plotted. After three days, seven consecutive points lie above the centre line, although all of them remain within the limits. The team interprets this as a shift in the process mean, checks the line and finds a weakening valve spring before any bottles are overfilled.
Frequently asked questions
What does a point outside the control limits mean?
That a special cause is probably at work. The process should be investigated before further defective results are produced.
Which patterns other than points beyond the limits are suspicious?
For example, longer runs of points on one side of the centre line, steady rises or falls, and conspicuously regular fluctuations.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Control chart. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/control-chart/
Hain, D. (n.d.): Control chart. PMDecoder. https://pmdecoder.com/en/glossary/control-chart/ (retrieved 24 November 2026)
@misc{controlchart,
author = {Hain, Dennis},
title = {Control chart},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/control-chart/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/control-chart/"> <p>Chart that shows measured values of a process over time with a centre line and control limits in order to detect changes in the process</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/control-chart/">Control chart</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.