Project management information system
also: Project management software · abbr. PMIS
Definition
A project management information system supports the planning, control and documentation of projects with digital tools. Typical components are scheduling and resource planning, task management, time recording, cost tracking, document storage, reporting and interfaces to accounting or human resources systems. It can consist of a single piece of software or of several connected applications.
Equivalents in other frameworks
Concept Software environment for project data · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Project management information system | equivalent | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Project management information system
- Topic area
- Monitoring and control
Distinction
The information system is a tool, not the project management system as a whole, which also includes methods, roles and rules. Simple task tools cover only part of it; portfolio software adds a view across many projects. An information system does not replace planning; it merely makes bad data visible faster.
In practice
A management consultancy with two hundred employees has so far planned its projects in spreadsheets, with hours recorded separately. When an integrated system is introduced, it turns out that each branch names tasks differently. Before the technical changeover, the management therefore agrees on a uniform project structure and uniform service types. Only then do the automated analyses deliver comparable figures on the utilization and profitability of individual projects.
Frequently asked questions
What should be clarified before selecting a system?
Which processes are to be supported, who needs which information, which interfaces are required and how much maintenance effort the teams can manage.
Is standard software or in-house development better?
Standard software with adaptations is usually sufficient. In-house developments rarely pay off because maintenance and further development tie up capacity permanently.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Project management information system. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/project-management-information-system/
Hain, D. (n.d.): Project management information system. PMDecoder. https://pmdecoder.com/en/glossary/project-management-information-system/ (retrieved 24 November 2026)
@misc{projectmanagementinformationsystem,
author = {Hain, Dennis},
title = {Project management information system},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/project-management-information-system/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/project-management-information-system/"> <p>Software-based environment that brings together the plans, resources, costs, documents and reports of one or more projects</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/project-management-information-system/">Project management information system</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.