Product Backlog item
abbr. PBI
Definition
A Product Backlog item describes a single piece of work intended to improve the product. It can be a new feature, a bug fix, a technical improvement or an investigation that answers an open question. The Scrum Guide prescribes no format. Common attributes are a description, a position in the order and a size; which further attributes an item has depends on the working environment. An item is ready for Sprint Planning when the team understands it well enough to complete it within one Sprint. To achieve this, large items are broken down and clarified during refinement.
Equivalents in other frameworks
Concept Item in an ordered work list · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| Kanban | Work item | closely related | need not come from a backlog; the focus is on its flow through the Kanban system |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
All designations of this concept side by side
Comparisons
Classification
- Broader term
- Product Backlog
- this term
- Product Backlog item
- Topic area
- Approaches and agility
Distinction
A user story is a widespread way of wording a Product Backlog item from the users' point of view, but it is not a requirement of Scrum. A work package in traditional planning is a defined task with fixed responsibility and a due date; a Product Backlog item, by contrast, remains changeable until it is taken into a Sprint. In the Sprint Backlog it is often divided into smaller tasks.
In practice
A team developing a job advertisement portal maintains the item "Upload applications with several attachments". It contains a short description, the permitted file formats, the maximum file size and the Developers' estimate. Because the item is too large for one Sprint, they split it during refinement into uploading individual files and combining them into an application pack.
Frequently asked questions
Do Product Backlog items have to be written as user stories?
No. Scrum leaves the format open. Many teams use user stories; others write items as a short description, a bug report or a hypothesis.
When is an item ready for the Sprint?
When the team understands it well enough to complete it within one Sprint in line with the Definition of Done. Some teams record their own criteria for this, often called a Definition of Ready; the Scrum Guide does not know this term.
Source and context
- Reference
- Scrum Guide 2020, Abschnitt Product Backlog
- Edition
- Scrum Guide 2020
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Product Backlog item. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/product-backlog-item/
Hain, D. (n.d.): Product Backlog item. PMDecoder, entry on Scrum Guide 2020, Abschnitt Product Backlog. https://pmdecoder.com/en/glossary/product-backlog-item/ (retrieved 24 November 2026)
@misc{productbacklogitem,
author = {Hain, Dennis},
title = {Product Backlog item},
note = {PMDecoder, Scrum Guide 2020, Abschnitt Product Backlog},
url = {https://pmdecoder.com/en/glossary/product-backlog-item/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/product-backlog-item/"> <p>Single element of the Product Backlog that describes a piece of work to improve the product, such as a feature, a fix or an investigation</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/product-backlog-item/">Product Backlog item</a>, PMDecoder, Scrum Guide 2020, Abschnitt Product Backlog</footer> </blockquote>
Found a mistake? Let us know, we check every report.