Corrective action

Definition

At PMI, a corrective action is a deliberately taken measure that brings project work performance back into line with the project management plan. It is prompted by an identified variance, such as a schedule delay or a cost overrun. The measure addresses the cause, not just the symptom, and its effect is checked afterwards. If it affects baselines or released results, it is submitted as a change request. In the process-based editions of the PMBOK Guide, it was one of the types of change request, alongside preventive action and defect repair.

Equivalents in other frameworks

Concept Action against an occurred deviation · one framework reviewed

Equivalents of Corrective action in other frameworks
FrameworkTerm thereRelationNote
ISO 21506Corrective actionequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Corrective action

Distinction

The PMI term is equivalent to “Korrekturmaßnahme” (corrective action) according to ISO 21506, which represents the concept in the glossary. A preventive action forestalls future variances; defect repair fixes a fault in a result. A workaround responds at short notice to a risk that has occurred and for which no response was planned.

In practice

The earned value evaluation of a construction project shows that interior finishing is three weeks behind plan. The cause is a shortage of drywall workers. As a corrective action, the project manager engages a second subcontractor for two floors. After four weeks she checks whether the backlog has been cleared.

Frequently asked questions

When does a corrective action require a change request?

When it changes baselines, released deliverables or agreements. Measures within the project manager’s authority can be decided and documented by the project manager.

How is the effect of a corrective action checked?

By measuring again the quantity that deviated, such as schedule or cost indicators. If there is no effect, the cause analysis was incomplete or the measure insufficient.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Corrective action. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/corrective-action-pmi/

Short form

Corrective action (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/corrective-action-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{correctiveactionpmi,
  title   = {Corrective action},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/corrective-action-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/corrective-action-pmi/">
  <p>Response to a deviation that has already occurred; it tackles the cause and brings project work back to what the project management plan lays down.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/corrective-action-pmi/">Corrective action</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.