Project life cycle

Definition

The project life cycle describes the successive stages in which a project unfolds. A simple model distinguishes initiating, planning, executing and closing; industry-specific models are more detailed, for example concept, design, approval, execution and commissioning. Each phase has its own results, and at the transitions between them it is usually decided whether and how the undertaking continues.

Equivalents in other frameworks

Concept Sequence of phases from project start to finish · one framework reviewed

Equivalents of Project life cycle in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKProject life cycleequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Project life cycle
Topic area
Fundamentals

Distinction

The project life cycle ends with project closure. The product life cycle extends further: it also covers market launch, use, maintenance and decommissioning of the result and can contain several projects. The life cycle differs from a process model in that it only describes the broad structure over time, whereas a process model also specifies activities, roles and types of results.

In practice

A local authority divides the construction of a new fire station into needs assessment, design, permits, tendering, construction and handover. Because the council releases funds only phase by phase, each phase ends with a submission that updates costs, dates and risks for the next stage. This allows the council to decide on a scaled-down version after the permit design, before any construction contracts are awarded. In agile undertakings the stages are shorter and repeat, but the basic principle remains.

Frequently asked questions

How many phases does a project life cycle have?

That depends on the industry and approach. Four basic phases are common; detailed models have seven or more.

Do phases always follow strictly one after another?

Mostly. Phases can, however, overlap when there is time pressure and the risk of parallel work is consciously accepted.

Source and context

Reference
ISO 21506:2024, 3.64
Edition
ISO 21506:2024
Cite this entry
APA

Hain, D. (n.d.). Project life cycle. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/project-life-cycle/

Short form

Hain, D. (n.d.): Project life cycle. PMDecoder, entry on ISO 21506:2024, 3.64. https://pmdecoder.com/en/glossary/project-life-cycle/ (retrieved 24 November 2026)

BibTeX
@misc{projectlifecycle,
  author  = {Hain, Dennis},
  title   = {Project life cycle},
  note    = {PMDecoder, ISO 21506:2024, 3.64},
  url     = {https://pmdecoder.com/en/glossary/project-life-cycle/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/project-life-cycle/">
  <p>Sequence of phases that a project passes through from initiation to closure.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/project-life-cycle/">Project life cycle</a>, PMDecoder, ISO 21506:2024, 3.64</footer>
</blockquote>

Found a mistake? Let us know, we check every report.