Risk identification

Definition

In PMI terms, risk identification means recognizing individual risks and the sources that feed the overall uncertainty of the project, and documenting their characteristics. This includes a clear description in terms of cause, event and effect and, where possible, a named owner. Common means are workshops, interviews, checklists, analysis of assumptions and constraints, SWOT analysis, lessons from earlier projects and the risk breakdown structure as a search framework. The result is recorded in the risk register. Identification is not a one-off activity; it is repeated throughout the project.

Equivalents in other frameworks

Concept Identifying potential risks · three frameworks reviewed

Equivalents of Risk identification in other frameworks
FrameworkTerm thereRelationNote
generalRisk identificationequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

Broader term
Risk management
this term
Risk identification

Distinction

The term corresponds to the cross-framework concept of risk identification. It precedes risk analysis, which evaluates and prioritizes identified risks. Collecting problems that have already occurred is not part of it; these are kept as issues in the issue log.

In practice

At the start of a project for a new production line, the project manager invites experts from engineering, procurement, occupational safety and operations to a half-day workshop. Using the risk breakdown structure and the lessons learned from a similar project, the group collects 35 risks, phrases each one as cause, event and effect, and names an owner for each.

Frequently asked questions

Who takes part in risk identification?

As many people as possible who know the undertaking from different angles: the team, subject matter experts, stakeholders and, where relevant, suppliers. Different perspectives uncover more risks.

Why phrase risks as cause, event and effect?

It separates the fact from which a risk arises from the uncertain event and its consequences. This makes assessment easier and shows where responses can take effect.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Risk identification. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/risk-identification-pmi/

Short form

Risk identification (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/risk-identification-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{riskidentificationpmi,
  title   = {Risk identification},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/risk-identification-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/risk-identification-pmi/">
  <p>Recognizing and describing individual project risks and the sources of overall project uncertainty.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/risk-identification-pmi/">Risk identification</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.