Risk breakdown structure

Definition

The risk breakdown structure arranges possible threats and opportunities on several levels, from general sources such as technical, organizational, external and commercial down to specific subcategories such as interfaces, suppliers or permits. It is often maintained as an organization-wide template and adapted for each project or programme. When searching for risks, it helps to go through all areas systematically; in the evaluation, it shows where risks cluster.

Equivalents in other frameworks

Concept Hierarchical breakdown of risk sources · three frameworks reviewed

Equivalents of Risk breakdown structure in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKRisk breakdown structureequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Risk breakdown structure

Distinction

A risk category is a single node, the risk breakdown structure the entire hierarchy. The work breakdown structure divides up the work, the risk breakdown structure the sources of possible disruptions and improvements. The risk register contains the individual risks, which are classified using the risk breakdown structure.

In practice

A civil engineering company has developed a risk breakdown structure with four main categories and 26 subcategories from twenty completed projects, including ground conditions, underground utilities, local residents and weather. On a new sewer project, the team goes through each subcategory in the risk workshop. Under underground utilities, it becomes apparent that no up-to-date plans of the telecommunications network are available for one section of road. The risk is recorded and clarified with trial trenches before construction starts.

Frequently asked questions

How is a good risk breakdown structure developed?

From an evaluation of the risks that occurred in earlier projects, supplemented by categories from the literature and industry experience; it is reviewed after each project.

Does every project need its own risk breakdown structure?

No. A shared template makes sense, supplemented with suitable categories for unusual projects.

Source and context

Reference
ISO 21506:2024, 3.78
Edition
ISO 21506:2024
Cite this entry
APA

Hain, D. (n.d.). Risk breakdown structure. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/risk-breakdown-structure/

Short form

Hain, D. (n.d.): Risk breakdown structure. PMDecoder, entry on ISO 21506:2024, 3.78. https://pmdecoder.com/en/glossary/risk-breakdown-structure/ (retrieved 24 November 2026)

BibTeX
@misc{riskbreakdownstructure,
  author  = {Hain, Dennis},
  title   = {Risk breakdown structure},
  note    = {PMDecoder, ISO 21506:2024, 3.78},
  url     = {https://pmdecoder.com/en/glossary/risk-breakdown-structure/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/risk-breakdown-structure/">
  <p>Hierarchical breakdown of the threats and opportunities of a project or programme, usually arranged by source of risk.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/risk-breakdown-structure/">Risk breakdown structure</a>, PMDecoder, ISO 21506:2024, 3.78</footer>
</blockquote>

Found a mistake? Let us know, we check every report.