Lessons learned
Definition
Lessons learned are insights that an undertaking draws from its own course, from successes as well as from mistakes. They describe a situation, how the team dealt with it, what came of it and how things should be done in future. According to ISO 21506, they are gathered throughout the undertaking, not only at closure, and they apply to programmes and portfolios just as much as to projects. They only deliver value once they are filed so that they can be found and are actually used in new undertakings.
Equivalents in other frameworks
Concept Captured lessons from projects · seven frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Lessons learned | equivalent | — |
| PRINCE2 | Lessons Report | closely related | Report that evaluates selected lessons and passes them on to the organization. |
| PRINCE2 | Learn from experience principle | partially overlapping | Principle of using lessons at the start, throughout and at the end, not the lessons themselves. |
| PRINCE2 | Lessons Log | partially overlapping | Log in which lessons are collected during the project. |
| PRINCE2 | End Project Report | partially overlapping | Mainly evaluates project performance; lessons can be summarized in it or attached as a Lessons Report. |
| PM² | Project-End Report | partially overlapping | contains lessons learned, but also reports on the performance and outcome of the project |
| Scrum | Sprint Retrospective | partially overlapping | continually improves the way the team works instead of documenting lessons for other initiatives |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Lessons learned
- Topic area
- Closing
Distinction
Project documentation records what happened; lessons learned draw conclusions from it for the future. A retrospective in agile teams is a regular meeting in which such insights are gained. The PMBOK Guide uses the same term.
In practice
A plant engineering company used to hold a closing workshop after each project, but nobody read the minutes. It therefore introduces a searchable knowledge base and requires entries after every milestone. Each entry states the trigger, the effect and a recommendation and is tagged by industry and plant type. When costing a new power station, the team finds three entries about delayed customs clearance in the same country and plans a six-week schedule buffer.
Frequently asked questions
When should lessons learned be collected?
Continuously, for example after milestones, phases or notable events. Anyone who waits until the end of the project has forgotten much, and the team is often already tied up in new tasks.
Why do lessons learned often have no effect?
Because they are collected but not prepared and filed in a way that others can find. They become effective when new undertakings explicitly consult them during planning and risk analysis.
Source and context
- Reference
- ISO 21506:2024, 3.34
- Edition
- ISO 21506:2024
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Lessons learned. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/lessons-learned-iso/
Hain, D. (n.d.): Lessons learned. PMDecoder, entry on ISO 21506:2024, 3.34. https://pmdecoder.com/en/glossary/lessons-learned-iso/ (retrieved 24 November 2026)
@misc{lessonslearnediso,
author = {Hain, Dennis},
title = {Lessons learned},
note = {PMDecoder, ISO 21506:2024, 3.34},
url = {https://pmdecoder.com/en/glossary/lessons-learned-iso/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/lessons-learned-iso/"> <p>Experience from a project, programme or portfolio, captured as knowledge intended to make future undertakings better.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/lessons-learned-iso/">Lessons learned</a>, PMDecoder, ISO 21506:2024, 3.34</footer> </blockquote>
Found a mistake? Let us know, we check every report.