Logical relationship

Definition

A logical relationship connects two activities, or an activity and a milestone, in a schedule and defines how their dates depend on each other. PMI distinguishes four types: finish-to-start, finish-to-finish, start-to-start and start-to-finish. Each relationship has a predecessor and a successor and can be supplemented by a lag or lead. Taken together, these relationships form the logic of the schedule on which the forward pass and backward pass are based. Missing or incorrect relationships lead to unreliable dates.

Equivalents in other frameworks

Concept Scheduling dependency between two activities · three frameworks reviewed

Equivalents of Logical relationship in other frameworks
FrameworkTerm thereRelationNote
generalLogical relationshipequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Logical relationship

Distinction

The logical relationship corresponds to the German Anordnungsbeziehung in network planning. In the PMI context, a further distinction is made according to the origin of a dependency, for example mandatory by nature of the work or discretionary, internal or external. That describes the reason for the dependency, whereas the logical relationship describes its form in the schedule.

In practice

When building a new customer portal, the project manager checks before the first schedule calculation that every activity has at least one predecessor and one successor. She notices that the data protection review is floating freely in the plan. It is linked as a predecessor of go-live, and the calculated launch date immediately moves by a week.

Frequently asked questions

Why should every activity have a predecessor and a successor?

Otherwise delays cannot be passed through the network, and the plan shows an end date that is too optimistic. The only exceptions are the project start and the project end.

Which relationship type is most common?

Finish-to-start. Start-to-start and finish-to-finish occur with overlapping work; start-to-finish is rare.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Logical relationship. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/logical-relationship-pmi/

Short form

Logical relationship (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/logical-relationship-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{logicalrelationshippmi,
  title   = {Logical relationship},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/logical-relationship-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/logical-relationship-pmi/">
  <p>Schedule link that defines how the start or finish of one activity depends on another activity or on a milestone.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/logical-relationship-pmi/">Logical relationship</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.