Validation
Definition
Validation checks whether a product, system or process actually does what it is intended for. It takes place under conditions as realistic as possible, often with real users, data and environments. In simple terms, the question is: did we build the right product? In regulated industries such as medical technology, pharmaceuticals or aviation, it is required by law or standards and documented rigorously.
Equivalents in other frameworks
Concept Evidence of fitness for purpose · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Validation | equivalent | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Validation
- Topic area
- Quality
Distinction
Verification checks against specified requirements, validation against the actual purpose. A pilot operation or a user test is a common form of validation. Acceptance is a contractual declaration, validation a technical check; the two can coincide, but they do not have to.
In practice
A hospital introduces a new documentation system for its intensive care unit. All specified functions have been verified. During validation, nurses work in parallel with the new system for a week in real shifts. It turns out that entering vital signs every hour requires too many clicks and is not done promptly in stressful situations. Although all requirements were met, the input screen is revised before roll-out.
Frequently asked questions
Why is verification not enough?
Because requirements can be incomplete or ambiguous. Only use under real conditions shows whether the result serves its purpose.
When should validation take place?
As early as possible with prototypes or pilot applications, and finally before broad roll-out, so that findings can still be acted on.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Validation. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/validation/
Hain, D. (n.d.): Validation. PMDecoder. https://pmdecoder.com/en/glossary/validation/ (retrieved 24 November 2026)
@misc{validation,
author = {Hain, Dennis},
title = {Validation},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/validation/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/validation/"> <p>Confirmation, through objective evidence, that a result is suitable for its intended use under real conditions</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/validation/">Validation</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.