Contingency plan

Definition

In PMI’s understanding, a contingency plan describes actions the project team will take if specific, previously defined trigger conditions occur. It is one of the contingent risk responses: instead of acting immediately, the team prepares a response and sets it in motion only when there are signs that a risk is occurring or has occurred. A complete contingency plan names the trigger, the actions, the person responsible and the resources needed, which often come from the contingency reserve. In case the contingency plan also fails, a fallback plan can be prepared as a further line of defence. Such plans are recorded in the risk register or in a separate document.

Equivalents in other frameworks

Concept Pre-planned response to an occurring risk · three frameworks reviewed

Equivalents of Contingency plan in other frameworks
FrameworkTerm thereRelationNote
generalContingency planclosely relateddenotes the plan with its triggers, the contingency response the reaction itself
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Contingency plan

Distinction

The contingency plan is close to the cross-framework term Ausweichmaßnahme but places more emphasis on the explicit trigger condition and on planning as a document of its own. It differs from a workaround in being planned in advance; a workaround is an unplanned response to an event that had not been prepared for.

In practice

For an open-air event, the team drafts a contingency plan for severe weather. The trigger is an official storm warning for the day of the event, issued no later than 24 hours beforehand. In that case a partner’s hall, already reserved, will be used, ticket holders are informed by text message and the caterer delivers to the new address. The reservation fee is included in the contingency reserve. When the warning actually comes, the move goes ahead without any debate on principles.

Frequently asked questions

What is a trigger in a contingency plan?

An observable condition whose occurrence sets the plan in motion, such as a measured value, a missed date or a notification. A clear trigger prevents responding too late or too early.

Does every risk need a contingency plan?

No. It is useful for risks that are deliberately not addressed at once but whose impact is large enough that a prepared response saves time and damage. For minor risks, acceptance without a further plan is often sufficient.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Contingency plan. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/contingency-plan-pmi/

Short form

Contingency plan (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/contingency-plan-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{contingencyplanpmi,
  title   = {Contingency plan},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/contingency-plan-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/contingency-plan-pmi/">
  <p>Set of responses agreed beforehand that the team puts into action as soon as defined trigger conditions arise.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/contingency-plan-pmi/">Contingency plan</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.