Risk tolerance
Definition
Risk tolerance translates an organization's attitude to risk into tangible limits. It specifies, for example, how much delay, what additional costs or what probability of serious damage can still be accepted. As long as the assessment of a risk stays below this limit, monitoring is enough; once it is crossed, risk responses or escalation are mandatory. The limits are assessed, agreed and explicitly adopted by the responsible body in advance.
Equivalents in other frameworks
Concept Threshold at which a risk triggers action · three frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Risk threshold | closely related | refers to the measurable limit above which action is taken, and is defined more narrowly |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
All designations of this concept side by side
Comparisons
Classification
- this term
- Risk tolerance
- Topic area
- Risks and opportunities
Distinction
Risk appetite describes in general terms how much risk an organization is willing to take on to achieve its objectives. Risk tolerance turns this into measurable limits for a specific undertaking. A variance threshold refers to deviations from the plan that have already occurred, risk tolerance to possible future events.
In practice
For the construction of a filling line, a pharmaceutical company decides that risks with an expected loss of more than 500,000 euros or a possible delay of more than six weeks exceed the project's risk tolerance. When it emerges that a supplier of stainless steel components is in financial difficulty and a delay of eight weeks is looming, the project manager has to present a response within one week. The response is to qualify a second supplier.
Frequently asked questions
Who sets risk tolerance?
The body that has to bear the consequences, usually the client, the sponsor or the steering committee, often on the project manager's proposal. Programmes and portfolios often have their own, higher-level limits.
Can risk tolerance change during the project?
Yes. As a project approaches a fixed date, such as a trade fair or a statutory deadline, tolerance for schedule risks often drops considerably. Such adjustments should be decided explicitly.
Source and context
- Reference
- ISO 21506:2024, 3.81
- Edition
- ISO 21506:2024
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Risk tolerance. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/risk-tolerance/
Hain, D. (n.d.): Risk tolerance. PMDecoder, entry on ISO 21506:2024, 3.81. https://pmdecoder.com/en/glossary/risk-tolerance/ (retrieved 24 November 2026)
@misc{risktolerance,
author = {Hain, Dennis},
title = {Risk tolerance},
note = {PMDecoder, ISO 21506:2024, 3.81},
url = {https://pmdecoder.com/en/glossary/risk-tolerance/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/risk-tolerance/"> <p>Limit up to which a project may carry a risk; once the limit is crossed, a defined response has to follow.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/risk-tolerance/">Risk tolerance</a>, PMDecoder, ISO 21506:2024, 3.81</footer> </blockquote>
Found a mistake? Let us know, we check every report.