Competence element: Plan and control
Definition
This competence element brings the other practice competences together. Starting from the project design, all components are combined into a balanced plan whose implementation is monitored and which is updated regularly when the project or its environment changes. Control itself is also continually improved. The ICB thus describes the ability to keep the project in view as a whole and to keep its management balanced. The six key competence indicators accompany the entire process: starting the project and having the project management plan approved, managing phase transitions, comparing performance with the plan, reporting, assessing and implementing changes, and finally closing and evaluating phases as well as the undertaking as a whole.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- Broader term
- Practice
- this term
- Competence element: Plan and control
Distinction
Project control refers to ongoing monitoring and correction, project planning to drawing up the plans; the competence element combines both across the whole life cycle. Unlike the Design element, which defines the basic approach, it works with the concrete planning. The ICB names management principles such as management by objectives or management by exception as knowledge for this element.
In practice
A project manager starts the introduction of a document management system with a kick-off and has the project management plan approved by the steering committee. Every month he compares costs, schedule and results with the plan and reports in a one-page status report. When the legal department demands an additional retention function, he assesses the effort and consequences and submits a change request for decision. After the pilot phase he records the lessons learned before the roll-out across the whole organization begins.
Frequently asked questions
Why is control itself adjusted?
Because projects change. A report or indicator that was suitable at the start may later be too coarse or too laborious; the ICB expects control to be developed accordingly.
Is project closure part of this element?
Yes. The last key competence indicator covers closing and evaluating a phase or the whole project, including the lessons learned.
Source and context
- Reference
- IPMA ICB 4.0, Abschnitt 4.5.10
- Edition
- IPMA Individual Competence Baseline 4.0
Cite this entry
Competence element: Plan and control. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/competence-element-plan-and-control/
Competence element: Plan and control (n.d.). PMDecoder, entry on IPMA ICB 4.0, Abschnitt 4.5.10. https://pmdecoder.com/en/glossary/competence-element-plan-and-control/ (retrieved 24 November 2026)
@misc{competenceelementplanandcontrol,
title = {Competence element: Plan and control},
note = {PMDecoder, IPMA ICB 4.0, Abschnitt 4.5.10},
url = {https://pmdecoder.com/en/glossary/competence-element-plan-and-control/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/competence-element-plan-and-control/"> <p>ICB 4 practice competence: integrating all subsidiary plans into one plan, controlling progress, managing changes and closing phases</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/competence-element-plan-and-control/">Competence element: Plan and control</a>, PMDecoder, IPMA ICB 4.0, Abschnitt 4.5.10</footer> </blockquote>
Found a mistake? Let us know, we check every report.