Root cause analysis
abbr. RCA
Definition
Root cause analysis keeps asking why until it arrives at a cause whose removal prevents the problem permanently. Common tools are the five whys technique, the cause-and-effect diagram by Kaoru Ishikawa, which groups possible causes into categories such as people, machine, material, method, measurement and environment, as well as data analyses and experiments. The result is a cause backed by evidence, from which an effective corrective action follows.
Equivalents in other frameworks
Concept Finding the underlying cause of a problem · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Root cause analysis | equivalent | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Root cause analysis
- Topic area
- Quality
Distinction
FMEA searches preventively for possible failures; root cause analysis investigates one that has occurred. A correction fixes the symptom, a corrective action removes the cause that was found. Several causes often act together, so it is not always possible to speak of a single root cause.
In practice
In a data centre project, a server fails three times in one month. The first explanation is: overheated. The five whys technique goes further. Why did it overheat? The fan was defective. Why was this not noticed? There was no monitoring. Why was there no monitoring? It was not included in the checklist during installation. The corrective action therefore consists not only of replacing the fan, but of an amended checklist and monitoring for all new servers.
Frequently asked questions
Are five why questions always enough?
No, the number is only a guide. Some problems need fewer questions, complex cases need several chains of causes and reliable data.
How can blame be avoided?
By having the analysis look for causes in processes and conditions, not for culprits. Openness only works if errors can be reported without sanctions.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Root cause analysis. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/root-cause-analysis/
Hain, D. (n.d.): Root cause analysis. PMDecoder. https://pmdecoder.com/en/glossary/root-cause-analysis/ (retrieved 24 November 2026)
@misc{rootcauseanalysis,
author = {Hain, Dennis},
title = {Root cause analysis},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/root-cause-analysis/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/root-cause-analysis/"> <p>Systematic approach to finding the actual cause of a problem that has occurred, rather than just treating its symptoms</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/root-cause-analysis/">Root cause analysis</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.