Risk mitigation

Definition

In PMI terms, risk mitigation is a response strategy for threats. The project takes early action to reduce the probability of occurrence, the severity of the consequences, or both. The underlying idea is that preventive action is usually cheaper than repairing damage once it has occurred. Examples are additional testing, less complex solutions, prototypes, redundant components or choosing a more reliable supplier. Where an action cannot address probability, it can deliberately limit the impact. PMI's counterpart for opportunities is enhancing them.

Equivalents in other frameworks

Concept Reducing probability or impact · three frameworks reviewed

Equivalents of Risk mitigation in other frameworks
FrameworkTerm thereRelationNote
generalRisk mitigationequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

Broader term
Risk response
this term
Risk mitigation

Distinction

The term corresponds to the cross-framework concept of risk mitigation. Risk avoidance seeks to eliminate the threat entirely; risk mitigation only reduces it, leaving a residual risk. Risk transference shifts the consequences to a third party instead of reducing them. A contingency plan only comes into play when the risk occurs; mitigation acts beforehand.

In practice

In a data migration project at an insurer, there is a danger that faulty legacy data will delay go-live. The team carries out two trial migrations with complete data sets and sets up automated plausibility checks. As a result, the probability of a delay falls from high to low.

Frequently asked questions

How can you tell whether risk mitigation is working?

By reassessing the risk after the action has been carried out. If probability or impact falls as planned, it has worked; otherwise further steps are needed.

Can risk mitigation cost too much?

Yes. The cost of the action should be in reasonable proportion to the expected reduction in damage. Otherwise risk acceptance may be the better choice.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Risk mitigation. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/risk-mitigation-pmi/

Short form

Risk mitigation (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/risk-mitigation-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{riskmitigationpmi,
  title   = {Risk mitigation},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/risk-mitigation-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/risk-mitigation-pmi/">
  <p>Strategy against threats that acts early to make their occurrence less likely or their consequences milder, for instance through tests or prototypes.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/risk-mitigation-pmi/">Risk mitigation</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.