Competence element: Quality
Definition
The competence element Quality looks at two sides. On the one hand, the quality of the approach: how a project is organized and which quality standards apply to projects, sub-projects and tasks. On the other, the quality of the results and outputs, which is planned, assured and checked. Both extend from the start of the project into the transition after its end. The five key competence indicators include drawing up and updating a quality management plan, reviewing deliverables against it, verifying that quality objectives have been achieved and recommending measures, planning the validation of the results and ensuring quality throughout.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- Broader term
- Practice
- this term
- Competence element: Quality
Distinction
Quality management describes the topic in general; the competence element the ability a person in the project needs for it. The ICB distinguishes verification, that is checking against specifications, from validation, that is checking fitness for purpose. As aids for process quality, it names among others Lean, Six Sigma, Kaizen and the Deming cycle.
In practice
A project is building an online portal for grant applications. In the quality management plan, the project manager specifies that every form page is checked for accessibility and proofread by two experts and that load tests are run before each release. Halfway through the project, an audit shows that the proofreading is dropped under time pressure. He schedules fixed time for it and, before launch, has twenty real applicants test the portal to confirm that it is fit for purpose.
Frequently asked questions
Why is checking the results not enough?
Because deficient processes lead to deficient results again and again. The ICB therefore also considers the quality of the processes the project works with.
Does quality management end with project closure?
Not entirely. The ICB includes the transition after the end of the project, in which the results are handed over to operations.
Source and context
- Reference
- IPMA ICB 4.0, Abschnitt 4.5.6
- Edition
- IPMA Individual Competence Baseline 4.0
Cite this entry
Competence element: Quality. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/competence-element-quality/
Competence element: Quality (n.d.). PMDecoder, entry on IPMA ICB 4.0, Abschnitt 4.5.6. https://pmdecoder.com/en/glossary/competence-element-quality/ (retrieved 24 November 2026)
@misc{competenceelementquality,
title = {Competence element: Quality},
note = {PMDecoder, IPMA ICB 4.0, Abschnitt 4.5.6},
url = {https://pmdecoder.com/en/glossary/competence-element-quality/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/competence-element-quality/"> <p>ICB 4 practice competence: planning, checking and assuring the quality of project processes and results throughout the life cycle</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/competence-element-quality/">Competence element: Quality</a>, PMDecoder, IPMA ICB 4.0, Abschnitt 4.5.6</footer> </blockquote>
Found a mistake? Let us know, we check every report.