Burn-down chart

also: Burn-down diagram

Definition

A burn-down chart shows how much work remains to be done in a given period. The horizontal axis shows time, for example the days of an iteration, and the vertical axis the remaining work, measured in tasks, hours or story points. A straight line from the starting value to zero at the end date serves as a guide. If the actual curve lies above it, the team is behind; if it lies below, the team is progressing faster than planned. Burn-down charts are commonly used for a single iteration and for a release spanning several iterations.

Equivalents in other frameworks

Concept Chart of remaining work over time · one framework reviewed

Equivalents of Burn-down chart in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKBurndown chartequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Burn-down chart

Distinction

A burn-up chart instead shows completed work and total scope as two lines. This makes it visible whether a team is progressing slowly or whether the scope has grown; in a burn-down chart, the two causes cannot be distinguished. The S-curve of traditional planning also tracks progress over time, but as cumulative values. The Scrum Guide mentions burn-down charts only as one of several ways of forecasting progress and does not prescribe them.

In practice

In a Sprint of ten working days, a team starts with 40 story points. After five days, the burn-down chart still shows 32 open points instead of the expected 20. In the Daily Scrum it becomes clear that the interface to a legacy system requires more work than estimated. The Product Owner and the Developers agree to remove a less important item from the Sprint so that the Sprint Goal remains achievable.

Frequently asked questions

What does a flat line in the burn-down chart mean?

That no work has been reported as done for several days. This may be due to impediments, but also to items only being fully completed late.

Is a burn-down chart mandatory in Scrum?

No. The Scrum Guide mentions it only as a possible aid. What matters more is that the Developers regularly inspect their progress towards the Sprint Goal.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Burn-down chart. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/burn-down-chart/

Short form

Hain, D. (n.d.): Burn-down chart. PMDecoder. https://pmdecoder.com/en/glossary/burn-down-chart/ (retrieved 24 November 2026)

BibTeX
@misc{burndownchart,
  author  = {Hain, Dennis},
  title   = {Burn-down chart},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/burn-down-chart/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/burn-down-chart/">
  <p>Chart showing the remaining work over time, with an ideal line indicating whether a team is likely to reach its goal</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/burn-down-chart/">Burn-down chart</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.