Issue log

Definition

In PMI usage, the issue log is the project document in which all issues are recorded and monitored until they are resolved. Typical details for each entry are an identifier, a short description, the date raised, who raised it, its priority, the owner, the target date, the current status and the resolution eventually chosen. The issue log is maintained throughout the project and is an important input to status meetings, reports and the review of lessons learned at the end.

Equivalents in other frameworks

Concept Register of issues · two frameworks reviewed

Equivalents of Issue log in other frameworks
FrameworkTerm thereRelationNote
ISO 21506Issue registerequivalent—
PRINCE2Issue Registerclosely relatedHolds only issues handled formally; informally handled matters are kept in the Daily Log. Requests for change are one type of issue.

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Issue log

Distinction

The issue log corresponds to the issue register in ISO 21506. It differs from the risk register in its subject: the risk register holds possible future events, the issue log existing problems. Change requests are usually tracked in a separate change log, even though an issue can prompt a change request. A team's task list is more general and also contains routine work.

In practice

A project to merge two sites keeps its issue log as a shared spreadsheet. Before each weekly meeting the project manager sorts the entries by priority and due date. Overdue items are discussed with their owners, and items without progress after two weeks are escalated to the steering committee. Resolved entries remain in the log with their resolution and serve as material for the lessons learned session at the end of the project.

Frequently asked questions

Who maintains the issue log?

Usually the project manager or a project office. Anyone involved can raise new issues; the respective owners update the status.

Should the issue log and the risk register be combined?

That is possible, for example in small projects, but it easily blurs the difference between prevention and problem-solving. Separate lists that are cross-referenced when a risk becomes an issue are more common.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Issue log. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/issue-log/

Short form

Issue log (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/issue-log/ (retrieved 24 November 2026)

BibTeX
@misc{issuelog,
  title   = {Issue log},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/issue-log/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/issue-log/">
  <p>Project document for capturing issues and following them up, with owner, status and resolution for each.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/issue-log/">Issue log</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.