Control

also: Project control

Definition

Control covers capturing the actual situation, checking it against the plan, analysing variances and, where necessary, taking corrective or preventive action. It concerns schedule, cost, scope and quality as well as risks and issues. The cycle of planning, measuring, comparing and acting is repeated at fixed intervals throughout the project, for example weekly or monthly.

Equivalents in other frameworks

Concept Monitoring and controlling a project · three frameworks reviewed

Equivalents of Control in other frameworks
FrameworkTerm thereRelationNote
PRINCE2Progress practiceclosely relatedControl through tolerances and management by exception with fixed escalation levels.
PM²Monitor & Controlclosely relateddescribed in PM² as a separate group of activities spanning all phases
PRINCE2Controlling a stagepartially overlappingControl of a single stage by the Project Manager; Project Board decisions belong to other processes.

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Control

Distinction

Monitoring is limited to observing and measuring; control includes intervening. In German-speaking countries, project controlling is often used as a synonym, but it is sometimes understood more narrowly as a support function that supplies data while the project manager makes the control decisions. In the German construction sector, Projektsteuerung is also the name of a distinct professional service that supports clients in their management tasks.

In practice

An energy utility is building a substation. Every month, each trade reports progress on its work packages, and project control compares these figures with the plan and the costs incurred. In the fourth month it becomes clear that civil works are within budget but three weeks behind schedule. The project manager has a second crew deployed, because otherwise the delivery date for the transformers could no longer be met.

Frequently asked questions

How often should control take place?

Often enough for variances to be spotted while corrective action is still possible: weekly for short, dynamic projects, often monthly for long construction projects.

What actions are available?

Additional resources, changed workflows, rescheduled dates, reduced scope or adjusted quality targets, in each case agreed with the client.

Source and context

Reference
ISO 21506:2024, 3.13
Edition
ISO 21506:2024
Cite this entry
APA

Hain, D. (n.d.). Control. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/control/

Short form

Hain, D. (n.d.): Control. PMDecoder, entry on ISO 21506:2024, 3.13. https://pmdecoder.com/en/glossary/control/ (retrieved 24 November 2026)

BibTeX
@misc{control,
  author  = {Hain, Dennis},
  title   = {Control},
  note    = {PMDecoder, ISO 21506:2024, 3.13},
  url     = {https://pmdecoder.com/en/glossary/control/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/control/">
  <p>Ongoing comparison of the project's status with the plan and initiation of action when variances put the objectives at risk.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/control/">Control</a>, PMDecoder, ISO 21506:2024, 3.13</footer>
</blockquote>

Found a mistake? Let us know, we check every report.