Plan-Do-Check-Act
Definition
Plan-Do-Check-Act (PDCA) is a cycle for continuous improvement that PMI adopts as a foundation of quality thinking. In the first step a change with an expected result is planned; in the second it is carried out on a small scale. In the third step the result is checked against expectations. In the fourth, action is taken: the change is adopted and embedded, discarded or adjusted, and the next cycle begins. The cycle goes back to Walter Shewhart and was popularized by W. Edwards Deming. For PMI it illustrates how improvement happens in small, checked steps rather than in one-off large changes.
Equivalents in other frameworks
Concept Cycle of plan, do, check and act · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| general | PDCA cycle | equivalent | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Plan-Do-Check-Act
- Topic area
- Quality
Distinction
The term corresponds to the cross-framework PDCA cycle; the full English form is common in the PMI context. Kaizen describes the attitude of continuous small improvement, PDCA the procedure for it. PDCA shares the basic idea of planning, doing and learning with the iterations of agile approaches but is not tied to fixed time periods.
In practice
A project team notices that coordination with the business department takes too long. It plans to clarify questions together once a week in a fixed meeting and tries this out for a month. The check shows shorter waiting times but overloaded meetings. The team keeps the meeting and in future sorts questions by urgency in advance.
Frequently asked questions
What exactly does “check” stand for?
For comparing the actual result with the expected one. Deming himself later preferred the word “study” to emphasize that the point is learning, not merely control.
Where is Plan-Do-Check-Act used in a project?
Wherever working methods or results are to be improved, for example inspection procedures, coordination channels or following findings from a root cause analysis.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Plan-Do-Check-Act. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/plan-do-check-act/
Plan-Do-Check-Act (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/plan-do-check-act/ (retrieved 24 November 2026)
@misc{plandocheckact,
title = {Plan-Do-Check-Act},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/plan-do-check-act/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/plan-do-check-act/"> <p>Four-step cycle for incremental improvement: plan, do, check the result, act.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/plan-do-check-act/">Plan-Do-Check-Act</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.