Planned date

also: Scheduled date

Definition

Planned dates are held in the current schedule and are recalculated or reset with every update. They take into account progress to date, changed durations, available resources and imposed dates. If they lie between the earliest and latest dates of an activity, the project end date is not at risk.

Equivalents in other frameworks

No equivalents have been recorded for this term yet.

Other terms

Other words for the same thing in English usage. Not to be confused with the equivalents above, which translate between frameworks.

Scheduled date
synonym
Planned start date
related, not equivalent
Planned finish date
related, not equivalent

Classification

this term
Planned date
Topic area
Scheduling

Distinction

The baseline date is the frozen version from the approved baseline; the planned date is the current one. The difference between them shows how far the plan has shifted. Earliest and latest dates are results of network calculations; the planned date can deliberately be placed between them. As soon as an activity has actually started or finished, the actual date takes the place of the planned date.

In practice

In a software project, the baseline set the end of the test phase for 30 April. After two delays, the planned date now stands at 14 May. The project manager shows both dates one above the other in the bar chart, the baseline date in grey and the planned date in colour. The client sees at a glance that the test phase will end two weeks later and can decide whether to postpone the launch date or reduce the scope of testing.

Frequently asked questions

How often do planned dates change?

With every schedule update, whenever progress, durations or resources change. Baseline dates, by contrast, remain stable.

What is a baseline date?

The date from the approved baseline. It serves as the yardstick for comparison and changes only after an approved change to the plan.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Planned date. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/planned-date/

Short form

Hain, D. (n.d.): Planned date. PMDecoder. https://pmdecoder.com/en/glossary/planned-date/ (retrieved 24 November 2026)

BibTeX
@misc{planneddate,
  author  = {Hain, Dennis},
  title   = {Planned date},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/planned-date/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/planned-date/">
  <p>Currently intended start or finish date of an activity, resulting from the schedule that is valid at the time</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/planned-date/">Planned date</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.