Critical path method
abbr. CPM
Definition
The critical path method works with fixed activity durations that are assumed to be known. A forward pass determines the earliest dates and a backward pass the latest; comparing them yields float and the critical path. The method was developed in the United States in the late 1950s for planning construction and maintenance projects in industry. To this day it forms the calculation core of most scheduling programs.
Equivalents in other frameworks
Concept Calculation method for dates and float · three frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Critical path method | equivalent | — |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Critical path method
- Topic area
- Network planning
Distinction
PERT, which emerged at about the same time, works with three estimates per activity and makes statements about probabilities. The critical chain method adds resource bottlenecks and pooled buffers. The critical path is the result, the critical path method the procedure.
In practice
A chemical company plans the annual shutdown of a production plant for maintenance work; every day of shutdown costs a great deal of money. The planners record around 600 maintenance activities with durations and dependencies and let the software do the calculation. The critical path runs through the replacement of a heat exchanger. For this, spare parts are provided in advance and round-the-clock shifts are planned, while non-critical work takes place during the day.
Frequently asked questions
What does the abbreviation CPM stand for?
For critical path method, the English name of the method, which in German is called Methode des kritischen Wegs.
What are the limits of the method?
It assumes fixed durations and takes into account neither uncertainty nor scarce resources. Complementary approaches such as PERT, simulations and resource levelling exist for this purpose.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Critical path method. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/critical-path-method/
Hain, D. (n.d.): Critical path method. PMDecoder. https://pmdecoder.com/en/glossary/critical-path-method/ (retrieved 24 November 2026)
@misc{criticalpathmethod,
author = {Hain, Dennis},
title = {Critical path method},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/critical-path-method/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/critical-path-method/"> <p>Calculation method of the network planning technique that determines dates, float and the critical path from durations and dependencies</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/critical-path-method/">Critical path method</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.