Quality planning

Definition

Quality planning translates requirements into concrete specifications for the project work. It clarifies which standards apply, which quality characteristics are measured, which checks take place when and by whom, which acceptance criteria apply and how deviations are dealt with. The result is often recorded in a quality plan or as part of the project management plan.

Equivalents in other frameworks

Concept Setting quality objectives and checks · three frameworks reviewed

Equivalents of Quality planning in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKQuality management planpartially overlappingdenotes the document in which the result of quality planning is recorded
PRINCE2Quality Management Approachpartially overlappingDefines standards, procedures and responsibilities; the quality criteria of individual products are in the product descriptions.
Six SigmaControl planpartially overlappingSets monitoring and reactions for a running process after the project, not quality assurance of the project results.

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Other terms

Other words for the same thing in English usage. Not to be confused with the equivalents above, which translate between frameworks.

Quality plan
related, not equivalent

Classification

Broader term
Quality management
this term
Quality planning
Topic area
Quality

Distinction

Quality planning defines what is to happen, quality assurance checks whether the planned processes are being followed, and quality control checks the results themselves. Inspection planning is a subset of quality planning that is limited to the type, scope and timing of checks.

In practice

For the development of a medical device, the project team draws up a quality plan at the start. It lists the relevant standards, specifies that every software change goes through a review by a second person and automated tests, sets three formal design reviews and assigns a responsible role to every check. Because the approval authority will later require evidence, the plan also governs which test records are retained and for how long.

Frequently asked questions

When does quality planning take place?

Early and in parallel with the rest of the project planning, because checks need time and resources that must be included in the schedule and the budget.

What belongs in a quality plan?

Quality objectives, applicable standards, inspection and approval steps, responsibilities, tools, documentation requirements and the handling of deviations.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Quality planning. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/quality-planning/

Short form

Hain, D. (n.d.): Quality planning. PMDecoder. https://pmdecoder.com/en/glossary/quality-planning/ (retrieved 24 November 2026)

BibTeX
@misc{qualityplanning,
  author  = {Hain, Dennis},
  title   = {Quality planning},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/quality-planning/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/quality-planning/">
  <p>Setting a project's quality objectives and the measures, checks, resources and responsibilities by which they are to be achieved</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/quality-planning/">Quality planning</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.