SWOT analysis

Definition

In PMI usage, SWOT analysis examines an organization, a project or an option in terms of its strengths and weaknesses as well as its opportunities and threats. Strengths and weaknesses describe internal characteristics, opportunities and threats external influences. In project management, the technique is used mainly in risk identification: threats can be derived from the organization's weaknesses and opportunities from its strengths. It also serves to assess options, for example in the business case or when choosing an approach.

Equivalents in other frameworks

Concept Strengths, weaknesses, opportunities and threats at a glance · one framework reviewed

Equivalents of SWOT analysis in other frameworks
FrameworkTerm thereRelationNote
generalSWOT analysisequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
SWOT analysis

Distinction

The term is equivalent to the cross-framework term SWOT analysis. In PMI usage, opportunities and threats both belong to the concept of risk, because a risk can have a positive or negative effect; SWOT analysis supplies candidates for this but does not replace their assessment in the risk register. An environmental analysis looks only at external influences, whereas SWOT analysis combines them with internal factors.

In practice

A medium-sized machinery manufacturer plans to build a plant in Southeast Asia for the first time. In a workshop, the project team prepares a SWOT analysis: the strength is the mature technology, the weakness the lack of experience with local permits, the opportunity a government funding programme, the threat fluctuating exchange rates. From the weakness and the threat, the team derives two risks with responses, and from the opportunity a task for procurement.

Frequently asked questions

How specific should the entries of a SWOT analysis be?

Specific enough to derive actions from them. General statements such as “good team” are of little use; “three staff members with experience of comparable plants” is better.

Is a SWOT analysis sufficient for risk identification?

No. It is a useful starting point but should be combined with other techniques such as checklists, interviews or the review of earlier projects.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

SWOT analysis. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/swot-analysis-pmi/

Short form

SWOT analysis (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/swot-analysis-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{swotanalysispmi,
  title   = {SWOT analysis},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/swot-analysis-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/swot-analysis-pmi/">
  <p>Structured comparison of internal strengths and weaknesses with external opportunities and threats, e.g. to identify risks or assess options.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/swot-analysis-pmi/">SWOT analysis</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.