Competence element: Time
Definition
This competence element deals with the time dimension of a project. It describes the ability to identify all the activities needed for the agreed results, put them in a sensible order, optimize the sequence and monitor its implementation. The five key competence indicators include defining activities, determining effort and duration, choosing an approach to scheduling and phases, including sprints where appropriate, drawing up a sequence and schedule, and measuring and adjusting progress against it. The ICB names classic tools such as network planning and the critical path as well as timeboxing and iterative approaches.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- Broader term
- Practice
- this term
- Competence element: Time
Distinction
The schedule and the sequence plan are outputs, schedule management is the activity; the competence element describes the ability behind them. The German edition calls the element Ablauf und Termine (sequence and schedule). How many people and how much material the activities need is covered by the competence element Resources.
In practice
For the renovation of a school building during the summer holidays, the project manager lists all the work, has the trades estimate duration and effort and sets the sequence: electrical work before drywall, drywall before painting. The network analysis shows that window installation lies on the critical path. She therefore agrees an earlier delivery with the window manufacturer and compares progress with the plan every week.
Frequently asked questions
Does the element also apply to agile projects?
Yes. The ICB explicitly names timeboxing, iterative development and sprints as possible approaches to time planning.
How does the element relate to phases?
One of the key competence indicators is defining an approach to scheduling and phases. Phases and milestones structure the schedule and create points in time for review and decision.
Source and context
- Reference
- IPMA ICB 4.0, Abschnitt 4.5.4
- Edition
- IPMA Individual Competence Baseline 4.0
Cite this entry
Competence element: Time. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/competence-element-time/
Competence element: Time (n.d.). PMDecoder, entry on IPMA ICB 4.0, Abschnitt 4.5.4. https://pmdecoder.com/en/glossary/competence-element-time/ (retrieved 24 November 2026)
@misc{competenceelementtime,
title = {Competence element: Time},
note = {PMDecoder, IPMA ICB 4.0, Abschnitt 4.5.4},
url = {https://pmdecoder.com/en/glossary/competence-element-time/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/competence-element-time/"> <p>ICB 4 practice competence: defining, estimating and sequencing a project's activities and monitoring progress</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/competence-element-time/">Competence element: Time</a>, PMDecoder, IPMA ICB 4.0, Abschnitt 4.5.4</footer> </blockquote>
Found a mistake? Let us know, we check every report.