Issue
Definition
An issue is something that has already happened and needs to be resolved: a missing decision, a technical problem, a conflict between stakeholders or contradictory requirements. Issues are kept in a register with a description, owner, priority, target date and status, and reviewed regularly until they are closed.
Equivalents in other frameworks
Concept Occurring problem that needs resolution · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Issue | equivalent | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Issue
- Topic area
- Monitoring and control
Distinction
A risk may occur, whereas an issue is already there; when a risk occurs, it becomes an issue. A task is planned work, whereas an issue is an unexpected matter to be clarified. ISO 21506 calls the corresponding list the issue register; in practice it is also known as an issue log.
In practice
While building a citizen services portal, the team discovers that two departments require different mandatory fields for the same form. The question is added to the issue register, owned by the sub-project manager for forms, with a target date two weeks away. Because it cannot be resolved by then, the project manager escalates it to the steering committee, which decides on a uniform rule. The decision and its date remain documented in the register.
Frequently asked questions
How do you tell issues from risks?
By asking whether it has already happened. Uncertain events belong in the risk register, events that have occurred in the issue register.
When must an issue be escalated?
When it cannot be resolved within the project, misses its target date or significantly jeopardizes schedule, cost or quality.
Source and context
- Reference
- ISO 21506:2024, 3.31
- Edition
- ISO 21506:2024
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Issue. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/issue/
Hain, D. (n.d.): Issue. PMDecoder, entry on ISO 21506:2024, 3.31. https://pmdecoder.com/en/glossary/issue/ (retrieved 24 November 2026)
@misc{issue,
author = {Hain, Dennis},
title = {Issue},
note = {PMDecoder, ISO 21506:2024, 3.31},
url = {https://pmdecoder.com/en/glossary/issue/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/issue/"> <p>Problem or unresolved question that has already arisen in a project and must be dealt with and decided so that work can continue.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/issue/">Issue</a>, PMDecoder, ISO 21506:2024, 3.31</footer> </blockquote>
Found a mistake? Let us know, we check every report.